US3149672A - Method and apparatus for electrical heating of oil-bearing formations - Google Patents
Method and apparatus for electrical heating of oil-bearing formations Download PDFInfo
- Publication number
- US3149672A US3149672A US192565A US19256562A US3149672A US 3149672 A US3149672 A US 3149672A US 192565 A US192565 A US 192565A US 19256562 A US19256562 A US 19256562A US 3149672 A US3149672 A US 3149672A
- Authority
- US
- United States
- Prior art keywords
- oil
- fractures
- transformer
- wellbore
- formation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 230000015572 biosynthetic process Effects 0.000 title claims description 47
- 238000000034 method Methods 0.000 title claims description 18
- 238000010438 heat treatment Methods 0.000 title claims description 6
- 238000005755 formation reaction Methods 0.000 title description 41
- 238000004519 manufacturing process Methods 0.000 claims description 12
- 230000004936 stimulating effect Effects 0.000 claims description 6
- 239000004020 conductor Substances 0.000 claims description 4
- 239000000463 material Substances 0.000 claims description 2
- 239000003921 oil Substances 0.000 description 45
- 238000004804 winding Methods 0.000 description 10
- 239000003795 chemical substances by application Substances 0.000 description 9
- 239000004576 sand Substances 0.000 description 8
- 230000000712 assembly Effects 0.000 description 5
- 238000000429 assembly Methods 0.000 description 5
- 229910000831 Steel Inorganic materials 0.000 description 4
- 239000012530 fluid Substances 0.000 description 4
- 239000002245 particle Substances 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 241000364021 Tulsa Species 0.000 description 2
- 229910052751 metal Inorganic materials 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 239000004033 plastic Substances 0.000 description 2
- 206010002368 Anger Diseases 0.000 description 1
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 1
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 description 1
- FYYHWMGAXLPEAU-UHFFFAOYSA-N Magnesium Chemical compound [Mg] FYYHWMGAXLPEAU-UHFFFAOYSA-N 0.000 description 1
- FAPWRFPIFSIZLT-UHFFFAOYSA-M Sodium chloride Chemical compound [Na+].[Cl-] FAPWRFPIFSIZLT-UHFFFAOYSA-M 0.000 description 1
- HCHKCACWOHOZIP-UHFFFAOYSA-N Zinc Chemical compound [Zn] HCHKCACWOHOZIP-UHFFFAOYSA-N 0.000 description 1
- 229910052782 aluminium Inorganic materials 0.000 description 1
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 229910052799 carbon Inorganic materials 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 239000002826 coolant Substances 0.000 description 1
- 239000012809 cooling fluid Substances 0.000 description 1
- 229910052802 copper Inorganic materials 0.000 description 1
- 239000010949 copper Substances 0.000 description 1
- 239000010779 crude oil Substances 0.000 description 1
- 230000006866 deterioration Effects 0.000 description 1
- 238000005485 electric heating Methods 0.000 description 1
- 238000010292 electrical insulation Methods 0.000 description 1
- 238000005868 electrolysis reaction Methods 0.000 description 1
- 230000004941 influx Effects 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 230000033001 locomotion Effects 0.000 description 1
- 210000003141 lower extremity Anatomy 0.000 description 1
- 229910052749 magnesium Inorganic materials 0.000 description 1
- 239000011777 magnesium Substances 0.000 description 1
- 239000013528 metallic particle Substances 0.000 description 1
- 150000002739 metals Chemical class 0.000 description 1
- 239000003027 oil sand Substances 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 239000003208 petroleum Substances 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 239000012858 resilient material Substances 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 239000011780 sodium chloride Substances 0.000 description 1
- 230000000638 stimulation Effects 0.000 description 1
- 210000001364 upper extremity Anatomy 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 229910052725 zinc Inorganic materials 0.000 description 1
- 239000011701 zinc Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/24—Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
- E21B43/2401—Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection by means of electricity
Definitions
- This invention relates to the production of relatively viscous oil from a subterranean reservoir penetrated by a well bore.
- a method and apparatus for thermally stimulating the production of oil from such a reservoir by downhole electric heating is provided. More specifically the method of the invention includes the step of passing an electric current between two vertically spaced fractures propped with particles of an electrical conductor.
- the apparatus includes a downhole transformer and two connection collar assemblies for establishing electrical contact between the propping agent of the fractures and the secondary windings of the downhole transformer.
- the method of the invention is primarily a process for thermally stimulating oil production. That is, heat is introduced into the oil-bearing formation for the purpose of reducing the viscosity of the oil, thereby facilitating flow of the oil into the wellbore and thence to the earths surface, either from innate pressure or by pumping. In a broad sense it has been recognized in the past that heat facilitates the production of viscous oil.
- Various downhole heaters have been developed to provide thermal stimulation. However, such methods have been found unsatisfactory because of the extremely slow rate of heat transfer outward from the wellbore.
- the present invention overcomes this difficulty by supplying heat directly to a relatively large volume of the oil-bearing formation surrounding a wellbore.
- the invention is applicable not only in solving the problem of viscous oil production, but also in the removal of parafiin wax deposits and other petroleum residues from the pores of the formation surrounding the wellbore. Such deposits are frequently troublesome, even in reservoirs where oil viscosity is not great enough to warrant application of the invention.
- the method comprises the steps of fracturing the oil-bearing formation in an upper region thereof, preferably at or near its upper boundary, fracturing said formation in a lower region thereof, preferably at or near its lower boundary, propping these fractures with particles of an electrical conductor, passing an electirc current through the oil-bearing formation between the fractures to heat the formation, and withdrawing oil from the well at a stimulated rate.
- a more limited embodiment of the method includes the steps of forming a substantially horizontal, metallic propped fracture at or near the upper boundary of the oil-bearing formation, and forming a second substantially horizontal, metallic propped fracture at or near the lower boundary of the oil-bearing formation.
- the fractures are extended radially a distance of 5-500 feet from the wellbore. Electrical contact is established between the fractures, which serve as electrodes, and a surface source of electric power. The voltage drop between th fractures is increased until the power input ranges from 10 watts to 10 kilowatts, per foot of sand thickness lying between the fractures.
- alternating current source is preferred, since direct current would cause a rapid deterioration of the propping agent, due to electrolysis. Moreover, the use of alternating current permits the convenient use of a downhole transformer to reduce line losses in transmitting power downhole.
- the well completion of the invention comprises a first metallic propped fracture extending radially from the wellbore in an upper portion of the oil-bearing formation, and a second metallic propped fracture extending radially from said wellbore in a lower portion of the formation.
- the completion includes regular steel casing to within two hundred feet of the producing oil sand and non-conductivecasing from this depth through the sand.
- the metallic propped fractures preferably extend from notched intervals in the borehole wall, where the casing is substantially cut away, as opposed to ordinary perforations in the casing.
- the non-conductive casing is perforated in the producing interval.
- the tubing string which extends opposite the producing formation is equipped with a downhole electrical transformer, connection collars, and rubber cups or packers to prevent short-circuiting by borehole fluids.
- preferred operation includes the use of fractures which are substantially horizontal, or more specifically, fractures which are substantially parallel to the boundaries of the oil-bearing formation, in the event that the boundaries are not horizontal.
- present fracturing techniques do not always ensure uniform horizontal fracture propagation. Irregular fractures do not pose a severe problem for purposes of the invention, however, especially in thick formations where the fractures are vertically spaced apart a considerable distance.
- the upper and lower fractures must not be allowed to interconnect at any point, since the resulting short circuit would defeat the basic purpose of the invention.
- the fractures are vertically spaced a distance of about three feet up to as much as one thousand feet or more, depending upon the thickness of the oil-bearing formation. Usually the spacing is from 10 feet to feet.
- the successful operation of the invention depends upon the ability of the oil-bearing reservoir to conduct an electric current. It is Well known, however, that oil sands do inherently possess substantial conductivity, due to the presence of at least small amounts of saline connate water.
- the resistivity of oil-bearing, unconsolidated sands usually ranges from about one to about fifty ohm-meters. Consolidated oil-bearing sandstones are generally less conductive, having a resistivity in the range of about ten to about one thousand ohm-meters.
- FIGURE 1 shows a cross-sectional view of the oil producing formation and the borehole, including the complete assembly of the invention.
- FIGURE 2 is a top view of the connection collar assembly which is mounted on the tubing string opposite each fracture.
- FIGURE 3 shows a cross-sectional view of the collar assembly taken along the line A-A of FIGURE 2.
- FIGURE 1 a cross-sectional view of the earth is shown which includes oil-bearing formation l1, overburden 12, and underburden 13 penetrated by wellbore 14.
- the well completion of the invention includes ordinary steel casing 15, plastic or other non-conducting casing 16 having perforations 17 therein, and larger openings or notches l8 and 19 near th upper and lower boundaries, respectively, of the oil-bearing formation.
- Extending radially from the wellbore into the formations at the level of notched interval 18 is a metallic propped fracture 20.
- a similar fracture 21 extends radially from the wellbore at the level of notched interval 19.
- a downhole transformer 23 Suspended within wellbore l4 and mounted on tubing string 22 is an assembly of elements comprising downhole transformer 23, connection collars 2d and 25, input cable 2s, cable 27 which connects collar 24 with the secondary winding of transformer 23, and cable 28 which connects collar with the secondary winding of the transformer.
- Bristles 2% extend in contact with the metallic propping agent of fracture 2t) completing the electrical connection with the secondary winding of transformer 23.
- the bristles of collar 25 establish contact with the propping agent of fracture 21, completing th electrical connection between the propping agent and the secondary winding of the transformer.
- the downhole transformer is employed in order to permit the transmission down the well of a high voltage, low current power supply which is then transformed downhole into a low voltage, high current power supply thereby reducing line losses in transmitting power down the well.
- connection collar assemblies The purpose of the connection collar assemblies is to establish electrical contact between the metal propping agent of the fractures and the secondary winding of the transformer.
- the assembly is preferably a radial metallic brush with the bristles connected to the secondary winding and insulated from the tubing string. As the tubing string is lowered into the well the bristles are bent up along the casing wall, and as the assembly passes the notched intervals in the borehole wall opposite the fractures, the bristles spring out, making contact with the propping agent. Slight motions of raising, lowering and rotating the tubing string are sometimes necessary to establish firm contact between the collar bristles and the propping agent in the fractures.
- Opening 37 is provided within tubing string 22 at a point beneath transformer 23 v hereby crude oil produced from the formation flows through the center of transformer 23 and serves as a cooling medium for said transformer.
- Conventional packers 32 and 33 are provided in order to seal the borehole and thereby prevent the collection of fluids within the borehole to the extent which would cause short-circuitin g between the respective collar bristles.
- Packer 34 is also desirable, to prevent formation fluids from entering the wellbore through notched interval 18, and to prevnt wellbore fluids from entering the formation.
- plastic or other non-conducting casing 16 must extend throughout the producing interval. The reason for this is that ordinary steel casing would cause short-circuiting directly between the connection collars and thus prevent any substantial penetration of the electric current into the formation to stimulate the production of oil.
- Ordinary perforations 17 are provided throughout the major portion of the producing interval in order to accommodate the influx of oil. Openings 1% and 1% pro vided near the upper and lower extremities of the producing interval are much larger than perforations 17 in order that they may accommodate bristles 29 and 3d of the connection collars. Propped fractures Ztl and 21 are then provided by any conventional techniques, an example of which is disclosed in US. 2,802,531, the details of which are not essential to a complete disclosure of the present invention.
- the metallic particles may be aluminum spheres, for example. Other metals are also suitable, including iron, copper, magnesium, and zinc. Carbon particles are also suitable.
- connection collars 29 and 3t and packers 32, 33 and 34 are mounted on tubing string 22, lowered into the wellbore, and positioned opposite the producing interval such that bristles 29 and 39 can be made to establish contact with the propping agent within fractures 20 and 21.
- the coils of transformer 23 are wrapped on a hollow core which surrounds tubing string 22.
- the transformer may operate from a 4,160 volt supply source with an approximate primary to secondary turns ratio of 500 to 1 and a power rating of 15 to 30 kilowatts.
- the transformer utilizes the produced oil as a cooling fluid and thus operates at temperatures below 250 F.
- Such a transformer has a minimum efiiciency of 90 percent.
- connection collar 24 which includes bristles 29 extending radially therefrom.
- the collar is mounted on tubing string 22 with a separation of the collar from the tubing by a band of electrical insulation 41.
- An opening 42 is provided through which the input cable 26 extends.
- Bristles 29 are made from a highly conductive, resilient material. As an example each bristle may be a steel strip one inch by one-tenth of an inch and about 12 inches long.
- Collar 25 and bristles 30 are essentially identical to collar 24 and bristles 29, the only difference being that no opening 42. is required therein. Accordingly, collar 25 is not separately illustrated or described in detail.
- bristles 29 are connected to collar 24 by means of bolts 44.
- Collar 24 is in turn connected to tubing 22 by means of bolts 43.
- Bolts 43 must be non-conducting in order to maintain the electrical insulating of collar 24 from tubing 22.
- Cable 27 from the secondary winding of transformer 23 is connected to collar 24 by bolts 44.
- the power requirement for the process ranges from about 10 watts to about 10 kilowatts, per foot of producing sand thickness.
- the preferred range is from about watts to about 1.0 kilowatt, per foot of producing sand thickness, depending on the degree of heating desired in a given formation.
- the temperature rise within the heated zone of the reservoir depends primarily upon the power input per foot of sand thickness, and the rate of oil flow, which acts to remove heat from the Zone.
- the temperature of the heated zone will be raised at least about 25 F., where the initial rate of drainage is 0.80 barrel per day, per foot of sand thickness, and as much as 890 P. where the initial production of oil is is only 0.25 barrel per day, per foot of sand thickness.
- a method for thermally stimulating the production of oil from a subterranean reservoir penetrated by a wellbore which comprises fracturing the oil-bearing formation in an upper region thereof, fracturing said formation in a lower region thereof, propping said fractures with particles of an electrical conductor, connecting said fractures with a source of electric current, passing an electric current between said fractures to heat said formation, and withdrawing oil from said Wellbore at a stimulated rate.
- Apparatus for electrically heating a subterranean oil-bearing formation penetrated by a wellbore, said formation having two vertically spaced conductor-propped fractures extending radially from said wellbore which comprises a transformer, an electrical input cable connected to the respective terminals of the primary Winding of said transformer, a connection collar assembly at each end of said transformer electrically connected to the respective terminals of the secondary winding of said transformer, said transformer and said collar assemblies being adapted to be mounted on a tubing string and lowered therewith into said wellbore to a position opposite said oil-bearing formation, said collar assemblies being spaced from each other along said tubing string a distance substantially equal to the vertical spacing of said fractures, and said collar assemblies comprising means for establishing electrical contact with the propping material in said fractures.
- a method for thermally stimulating the production of oil from a subterranean reservoir penetrated by a wellbore which comprises forming a substantially horizontal, metallic propped fracture near the upper boundary of the oil-bearing formation, forming a substantially horizontal, metallic propped fracture near the lower boundary of said formation, establishing electrical contact between said fractures and a surface source of electric power, increasing the voltage applied to said fractures until the power input to the formation falls within the range of 100 watts to 1.0 kilowatts, per foot of oil-bearing formation, and producing oil from said formation at a stimulated rate.
- a method for thermally stimulating the production of oil from a subterranean reservoir penetrated by a wellbore which comprises forming a metallic propped fracture near the upper boundary of the oil-bearing formation, forming a metallic propped fracture near the lower boundary of said formation, establishing electrical contact between said fractures and a surface source of electric power, establishing a voltage drop between said fractures which corresponds to a power input to the formation within the range of 10 watts to 10 kilowatts per foot of oil-bearing formation, and producing oil from said formation at a stimulated rate.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Connector Housings Or Holding Contact Members (AREA)
Description
p 1964 J. ORKISZEWSKI ETAL 3,
METHOD AND APPARATUS FOR ELECTRICAL HEATING *OF OIL-BEARING FORMATIONS Filed May 4, 1962 2 Sheets-Sheet 1 JOSEPH ORKISZEWSKI 25 JAMES L. HILL FIG. 1 PRESTON s. MQREYNOLDS THOMAS c. BOBERG INVENTORS A TORNEY Sept. 22, 1964 J. ORKISZEWSKI ETAL 3,149,672
METHOD AND APPARATUS FOR ELECTRICAL HEATING 0F OIL-BEARING FORMATIONS Flled May 4, 1962 2 Sheets$heet 2 FIG. 2
JOSEPH ORKISZEWSKI JAMES L. HILL PRESTON S. MQREYNOLDS THOMAS C. BOBERG INVENTORS ATT RNEY United States Patent Office angers Patented E'aept. 22, 1964 3,149,672 METHGD AND APPARATUS FGR ELECTRKIAL I-lEATlNG F QTL-EEARTNG FQRMA'HQNS Jioseph Orlriszewshi, Tulsa, Gilda, James L. Hill, Etiennpaign, Hill, and Yreston S. McReynoids and Thomas C.
Bo erg, Tulsa, Okla, assignors to Jersey Production Research Company, a corporation of Delaware Filed May 4, 1%2, Ser. No. 192,565 '7 Claims. (Cl. 166-39) This invention relates to the production of relatively viscous oil from a subterranean reservoir penetrated by a well bore. A method and apparatus for thermally stimulating the production of oil from such a reservoir by downhole electric heating is provided. More specifically the method of the invention includes the step of passing an electric current between two vertically spaced fractures propped with particles of an electrical conductor. The apparatus includes a downhole transformer and two connection collar assemblies for establishing electrical contact between the propping agent of the fractures and the secondary windings of the downhole transformer.
The method of the invention is primarily a process for thermally stimulating oil production. That is, heat is introduced into the oil-bearing formation for the purpose of reducing the viscosity of the oil, thereby facilitating flow of the oil into the wellbore and thence to the earths surface, either from innate pressure or by pumping. In a broad sense it has been recognized in the past that heat facilitates the production of viscous oil. Various downhole heaters have been developed to provide thermal stimulation. However, such methods have been found unsatisfactory because of the extremely slow rate of heat transfer outward from the wellbore. The present invention overcomes this difficulty by supplying heat directly to a relatively large volume of the oil-bearing formation surrounding a wellbore.
The invention is applicable not only in solving the problem of viscous oil production, but also in the removal of parafiin wax deposits and other petroleum residues from the pores of the formation surrounding the wellbore. Such deposits are frequently troublesome, even in reservoirs where oil viscosity is not great enough to warrant application of the invention.
Broadly the method comprises the steps of fracturing the oil-bearing formation in an upper region thereof, preferably at or near its upper boundary, fracturing said formation in a lower region thereof, preferably at or near its lower boundary, propping these fractures with particles of an electrical conductor, passing an electirc current through the oil-bearing formation between the fractures to heat the formation, and withdrawing oil from the well at a stimulated rate.
A more limited embodiment of the method includes the steps of forming a substantially horizontal, metallic propped fracture at or near the upper boundary of the oil-bearing formation, and forming a second substantially horizontal, metallic propped fracture at or near the lower boundary of the oil-bearing formation. The fractures are extended radially a distance of 5-500 feet from the wellbore. Electrical contact is established between the fractures, which serve as electrodes, and a surface source of electric power. The voltage drop between th fractures is increased until the power input ranges from 10 watts to 10 kilowatts, per foot of sand thickness lying between the fractures.
An alternating current source is preferred, since direct current would cause a rapid deterioration of the propping agent, due to electrolysis. Moreover, the use of alternating current permits the convenient use of a downhole transformer to reduce line losses in transmitting power downhole.
The well completion of the invention comprises a first metallic propped fracture extending radially from the wellbore in an upper portion of the oil-bearing formation, and a second metallic propped fracture extending radially from said wellbore in a lower portion of the formation. The completion includes regular steel casing to within two hundred feet of the producing oil sand and non-conductivecasing from this depth through the sand. The metallic propped fractures preferably extend from notched intervals in the borehole wall, where the casing is substantially cut away, as opposed to ordinary perforations in the casing. Next, the non-conductive casing is perforated in the producing interval. The tubing string which extends opposite the producing formation is equipped with a downhole electrical transformer, connection collars, and rubber cups or packers to prevent short-circuiting by borehole fluids.
It will be readily appreciated that preferred operation includes the use of fractures which are substantially horizontal, or more specifically, fractures which are substantially parallel to the boundaries of the oil-bearing formation, in the event that the boundaries are not horizontal. However, present fracturing techniques do not always ensure uniform horizontal fracture propagation. Irregular fractures do not pose a severe problem for purposes of the invention, however, especially in thick formations where the fractures are vertically spaced apart a considerable distance. Of course, the upper and lower fractures must not be allowed to interconnect at any point, since the resulting short circuit would defeat the basic purpose of the invention. The fractures are vertically spaced a distance of about three feet up to as much as one thousand feet or more, depending upon the thickness of the oil-bearing formation. Usually the spacing is from 10 feet to feet.
The successful operation of the invention depends upon the ability of the oil-bearing reservoir to conduct an electric current. It is Well known, however, that oil sands do inherently possess substantial conductivity, due to the presence of at least small amounts of saline connate water. The resistivity of oil-bearing, unconsolidated sands usually ranges from about one to about fifty ohm-meters. Consolidated oil-bearing sandstones are generally less conductive, having a resistivity in the range of about ten to about one thousand ohm-meters.
FIGURE 1 shows a cross-sectional view of the oil producing formation and the borehole, including the complete assembly of the invention. v
FIGURE 2 is a top view of the connection collar assembly which is mounted on the tubing string opposite each fracture.
FIGURE 3 shows a cross-sectional view of the collar assembly taken along the line A-A of FIGURE 2.
Referring now to FIGURE 1 in detail, a cross-sectional view of the earth is shown which includes oil-bearing formation l1, overburden 12, and underburden 13 penetrated by wellbore 14. The well completion of the invention includes ordinary steel casing 15, plastic or other non-conducting casing 16 having perforations 17 therein, and larger openings or notches l8 and 19 near th upper and lower boundaries, respectively, of the oil-bearing formation. Extending radially from the wellbore into the formations at the level of notched interval 18 is a metallic propped fracture 20. A similar fracture 21 extends radially from the wellbore at the level of notched interval 19.
Suspended within wellbore l4 and mounted on tubing string 22 is an assembly of elements comprising downhole transformer 23, connection collars 2d and 25, input cable 2s, cable 27 which connects collar 24 with the secondary winding of transformer 23, and cable 28 which connects collar with the secondary winding of the transformer. Bristles 2% extend in contact with the metallic propping agent of fracture 2t) completing the electrical connection with the secondary winding of transformer 23. Similarly, the bristles of collar 25 establish contact with the propping agent of fracture 21, completing th electrical connection between the propping agent and the secondary winding of the transformer.
The downhole transformer is employed in order to permit the transmission down the well of a high voltage, low current power supply which is then transformed downhole into a low voltage, high current power supply thereby reducing line losses in transmitting power down the well.
The purpose of the connection collar assemblies is to establish electrical contact between the metal propping agent of the fractures and the secondary winding of the transformer. The assembly is preferably a radial metallic brush with the bristles connected to the secondary winding and insulated from the tubing string. As the tubing string is lowered into the well the bristles are bent up along the casing wall, and as the assembly passes the notched intervals in the borehole wall opposite the fractures, the bristles spring out, making contact with the propping agent. Slight motions of raising, lowering and rotating the tubing string are sometimes necessary to establish firm contact between the collar bristles and the propping agent in the fractures.
Opening 37. is provided within tubing string 22 at a point beneath transformer 23 v hereby crude oil produced from the formation flows through the center of transformer 23 and serves as a cooling medium for said transformer.
For the purpose of carrying out the invention, plastic or other non-conducting casing 16 must extend throughout the producing interval. The reason for this is that ordinary steel casing would cause short-circuiting directly between the connection collars and thus prevent any substantial penetration of the electric current into the formation to stimulate the production of oil.
Next, the downhole transformer 23, connection collars 29 and 3t and packers 32, 33 and 34 are mounted on tubing string 22, lowered into the wellbore, and positioned opposite the producing interval such that bristles 29 and 39 can be made to establish contact with the propping agent within fractures 20 and 21.
The coils of transformer 23 are wrapped on a hollow core which surrounds tubing string 22. As an example, the transformer may operate from a 4,160 volt supply source with an approximate primary to secondary turns ratio of 500 to 1 and a power rating of 15 to 30 kilowatts. Preferably, the transformer utilizes the produced oil as a cooling fluid and thus operates at temperatures below 250 F. Such a transformer has a minimum efiiciency of 90 percent.
Referring now to FIGURE 2, a top view of connection collar 24 is shown which includes bristles 29 extending radially therefrom. The collar is mounted on tubing string 22 with a separation of the collar from the tubing by a band of electrical insulation 41. An opening 42 is provided through which the input cable 26 extends. Bristles 29 are made from a highly conductive, resilient material. As an example each bristle may be a steel strip one inch by one-tenth of an inch and about 12 inches long.
Referring now to FIGURE 3 bristles 29 are connected to collar 24 by means of bolts 44. Collar 24 is in turn connected to tubing 22 by means of bolts 43. Bolts 43 must be non-conducting in order to maintain the electrical insulating of collar 24 from tubing 22. Cable 27 from the secondary winding of transformer 23 is connected to collar 24 by bolts 44.
The power requirement for the process ranges from about 10 watts to about 10 kilowatts, per foot of producing sand thickness. The preferred range is from about watts to about 1.0 kilowatt, per foot of producing sand thickness, depending on the degree of heating desired in a given formation.
At equilibrium conditions, the temperature rise within the heated zone of the reservoir depends primarily upon the power input per foot of sand thickness, and the rate of oil flow, which acts to remove heat from the Zone. Within the preferred range of power input, as stated above, the temperature of the heated zone will be raised at least about 25 F., where the initial rate of drainage is 0.80 barrel per day, per foot of sand thickness, and as much as 890 P. where the initial production of oil is is only 0.25 barrel per day, per foot of sand thickness.
As a specific example of the invention, calculations show that a stimulated flow rate of 100 barrels of oil per day is attained from an expenditure of 17.5 kilowatts of efiective power input to a system having the following characteristics:
Well depth ft 2800 Producing sand thickness ft 50 Drainage radius ft 500 Well base radius ft 0.25 Fracture radius ft 60 Volumetric heat capacity, F. B.t.u./ft. 31.25 Initial reservoir temp. F 84 Initial oil viscosity cp 432 Unstimulated flow rate bbls./day 50 What is claimed is:
1. A method for thermally stimulating the production of oil from a subterranean reservoir penetrated by a wellbore, which comprises fracturing the oil-bearing formation in an upper region thereof, fracturing said formation in a lower region thereof, propping said fractures with particles of an electrical conductor, connecting said fractures with a source of electric current, passing an electric current between said fractures to heat said formation, and withdrawing oil from said Wellbore at a stimulated rate.
2. A method as defined by claim 1 wherein said fractures are substantially horizontal.
3. Apparatus for electrically heating a subterranean oil-bearing formation penetrated by a wellbore, said formation having two vertically spaced conductor-propped fractures extending radially from said wellbore, which comprises a transformer, an electrical input cable connected to the respective terminals of the primary Winding of said transformer, a connection collar assembly at each end of said transformer electrically connected to the respective terminals of the secondary winding of said transformer, said transformer and said collar assemblies being adapted to be mounted on a tubing string and lowered therewith into said wellbore to a position opposite said oil-bearing formation, said collar assemblies being spaced from each other along said tubing string a distance substantially equal to the vertical spacing of said fractures, and said collar assemblies comprising means for establishing electrical contact with the propping material in said fractures.
4. Apparatus as defined by claim 3, wherein said fractures are substantially horizontal.
5. A method for thermally stimulating the production of oil from a subterranean reservoir penetrated by a wellbore, which comprises forming a substantially horizontal, metallic propped fracture near the upper boundary of the oil-bearing formation, forming a substantially horizontal, metallic propped fracture near the lower boundary of said formation, establishing electrical contact between said fractures and a surface source of electric power, increasing the voltage applied to said fractures until the power input to the formation falls within the range of 100 watts to 1.0 kilowatts, per foot of oil-bearing formation, and producing oil from said formation at a stimulated rate.
6. A method for thermally stimulating the production of oil from a subterranean reservoir penetrated by a wellbore, which comprises forming a metallic propped fracture near the upper boundary of the oil-bearing formation, forming a metallic propped fracture near the lower boundary of said formation, establishing electrical contact between said fractures and a surface source of electric power, establishing a voltage drop between said fractures which corresponds to a power input to the formation within the range of 10 watts to 10 kilowatts per foot of oil-bearing formation, and producing oil from said formation at a stimulated rate.
7. A method as defined by claim 6, wherein said fractures are substantially horizontal.
References Cited in the file of this patent UNITED STATES PATENTS 849,524 Baker Apr. 9, 1907 2,634,961 Ljungstrom Apr. 14, 1953 2,795,279 Sarapuu June 11, 1957 2,801,090 Hoyer et al. July 30, 1957
Claims (2)
1. A METHOD FOR THERMALLY STIMULATING THE PRODUCTION OF OIL FROM A SUBTERRANEAN RESERVOIR PENETRATED BY A WELLBORE, WHICH COMPRISES FRACTURING THE OIL-BEARING FORMATION IN AN UPPER REGION THEREOF, FRACTURING SAID FORMATION IN A LOWER REGION THEREOF, PROPPING SAID FRACTURES WITH PAR-F TICLES OF AN ELECTRICAL CONDUCTOR, CONNECTING SAID FRACTURES WITH A SOURCE OF ELECTRIC CURRENT, PASSING AN ELECTRIC CURRENT BETWEEN SAID FRACTURES TO HEAT SAID FORMATION, AND WITHDRAWING OIL FROM SAID WELLBORE AT A STIMULATED RATE.
3. APPARATUS FOR ELECTRICALLY HEATING A SUBTERRANEAN OIL-BEARING FORMATION PENETRATED BY A WELLBORE, SAID FORMATION HAVING TWO VERTICALLY SPACED CONDUCTOR-PROPPED FRACTURES EXTENDING RADIALLY FROM SAID WELLBORE, WHICH COMPRISES A TRANSFORMER, AN ELECTRICAL INPUT CABLE CONNECTED TO THE RESPECTIVE TERMINALS OF THE PRIMARY WINDING OF SAID TRANSFORMER, A CONNECTION COLLAR ASSEMBLY AT EACH END OF SAID TRANSFORMER ELECTRICALLY CONNECTED TO THE RESPECTIVE TERMINALS OF THE SECONDARY WINDING OF SAID TRANSFORMER, SAID TRANSFORMER AND SAID COLLAR ASSEMBLIES BEING ADAPTED TO BE MOUNTED ON A TUBING STRING AND LOWERED THEREWITH INTO SAID WELLBORE TO A POSITION OPPOSITE SAID OIL-BEARING FORMATION, SAID COLLAR ASSEMBLIES BEING SPACED FROM EACH OTHER ALONG SAID TUBING STRING A DISTANCE SUBSTANTIALLY EQUAL TO THE VERTICAL SPACING OF SAID FRACTURES, AND SAID COLLAR ASSEMBLIES COMPRISING MEANS FOR ESTABLISHING ELECTRICAL CONTACT WITH THE PROPPING MATERIAL IN SAID FRACTURES.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US192565A US3149672A (en) | 1962-05-04 | 1962-05-04 | Method and apparatus for electrical heating of oil-bearing formations |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US192565A US3149672A (en) | 1962-05-04 | 1962-05-04 | Method and apparatus for electrical heating of oil-bearing formations |
Publications (1)
Publication Number | Publication Date |
---|---|
US3149672A true US3149672A (en) | 1964-09-22 |
Family
ID=22710198
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US192565A Expired - Lifetime US3149672A (en) | 1962-05-04 | 1962-05-04 | Method and apparatus for electrical heating of oil-bearing formations |
Country Status (1)
Country | Link |
---|---|
US (1) | US3149672A (en) |
Cited By (115)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3417823A (en) * | 1966-12-22 | 1968-12-24 | Mobil Oil Corp | Well treating process using electroosmosis |
US3507330A (en) * | 1968-09-30 | 1970-04-21 | Electrothermic Co | Method and apparatus for secondary recovery of oil |
US3620300A (en) * | 1970-04-20 | 1971-11-16 | Electrothermic Co | Method and apparatus for electrically heating a subsurface formation |
US3642066A (en) * | 1969-11-13 | 1972-02-15 | Electrothermic Co | Electrical method and apparatus for the recovery of oil |
US3862662A (en) * | 1973-12-12 | 1975-01-28 | Atlantic Richfield Co | Method and apparatus for electrical heating of hydrocarbonaceous formations |
US4084639A (en) * | 1976-12-16 | 1978-04-18 | Petro Canada Exploration Inc. | Electrode well for electrically heating a subterranean formation |
US4401162A (en) * | 1981-10-13 | 1983-08-30 | Synfuel (An Indiana Limited Partnership) | In situ oil shale process |
US4495990A (en) * | 1982-09-29 | 1985-01-29 | Electro-Petroleum, Inc. | Apparatus for passing electrical current through an underground formation |
US4524827A (en) * | 1983-04-29 | 1985-06-25 | Iit Research Institute | Single well stimulation for the recovery of liquid hydrocarbons from subsurface formations |
US4567945A (en) * | 1983-12-27 | 1986-02-04 | Atlantic Richfield Co. | Electrode well method and apparatus |
US4662438A (en) * | 1985-07-19 | 1987-05-05 | Uentech Corporation | Method and apparatus for enhancing liquid hydrocarbon production from a single borehole in a slowly producing formation by non-uniform heating through optimized electrode arrays surrounding the borehole |
US4705108A (en) * | 1986-05-27 | 1987-11-10 | The United States Of America As Represented By The United States Department Of Energy | Method for in situ heating of hydrocarbonaceous formations |
US4886118A (en) * | 1983-03-21 | 1989-12-12 | Shell Oil Company | Conductively heating a subterranean oil shale to create permeability and subsequently produce oil |
US5101899A (en) * | 1989-12-14 | 1992-04-07 | International Royal & Oil Company | Recovery of petroleum by electro-mechanical vibration |
US5713415A (en) * | 1995-03-01 | 1998-02-03 | Uentech Corporation | Low flux leakage cables and cable terminations for A.C. electrical heating of oil deposits |
US6199634B1 (en) | 1998-08-27 | 2001-03-13 | Viatchelav Ivanovich Selyakov | Method and apparatus for controlling the permeability of mineral bearing earth formations |
US6328102B1 (en) | 1995-12-01 | 2001-12-11 | John C. Dean | Method and apparatus for piezoelectric transport |
US20020121374A1 (en) * | 2001-03-01 | 2002-09-05 | Aaron Ranson | Method for heating subterranean formation, particularly for heating reservoir fluids in near well bore zone |
US6581684B2 (en) | 2000-04-24 | 2003-06-24 | Shell Oil Company | In Situ thermal processing of a hydrocarbon containing formation to produce sulfur containing formation fluids |
US6588504B2 (en) | 2000-04-24 | 2003-07-08 | Shell Oil Company | In situ thermal processing of a coal formation to produce nitrogen and/or sulfur containing formation fluids |
US20030131995A1 (en) * | 2001-04-24 | 2003-07-17 | De Rouffignac Eric Pierre | In situ thermal processing of a relatively impermeable formation to increase permeability of the formation |
US20030131993A1 (en) * | 2001-04-24 | 2003-07-17 | Etuan Zhang | In situ thermal processing of an oil shale formation with a selected property |
US6698515B2 (en) | 2000-04-24 | 2004-03-02 | Shell Oil Company | In situ thermal processing of a coal formation using a relatively slow heating rate |
US6715546B2 (en) | 2000-04-24 | 2004-04-06 | Shell Oil Company | In situ production of synthesis gas from a hydrocarbon containing formation through a heat source wellbore |
US6715548B2 (en) | 2000-04-24 | 2004-04-06 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation to produce nitrogen containing formation fluids |
US6969123B2 (en) | 2001-10-24 | 2005-11-29 | Shell Oil Company | Upgrading and mining of coal |
US7077198B2 (en) | 2001-10-24 | 2006-07-18 | Shell Oil Company | In situ recovery from a hydrocarbon containing formation using barriers |
US7096953B2 (en) | 2000-04-24 | 2006-08-29 | Shell Oil Company | In situ thermal processing of a coal formation using a movable heating element |
US20070000662A1 (en) * | 2003-06-24 | 2007-01-04 | Symington William A | Methods of treating a subterranean formation to convert organic matter into producible hydrocarbons |
US20080035346A1 (en) * | 2006-04-21 | 2008-02-14 | Vijay Nair | Methods of producing transportation fuel |
US20080107577A1 (en) * | 2005-10-24 | 2008-05-08 | Vinegar Harold J | Varying heating in dawsonite zones in hydrocarbon containing formations |
US20080128134A1 (en) * | 2006-10-20 | 2008-06-05 | Ramesh Raju Mudunuri | Producing drive fluid in situ in tar sands formations |
WO2008115359A1 (en) * | 2007-03-22 | 2008-09-25 | Exxonmobil Upstream Research Company | Granular electrical connections for in situ formation heating |
US20090071652A1 (en) * | 2007-04-20 | 2009-03-19 | Vinegar Harold J | In situ heat treatment from multiple layers of a tar sands formation |
US20090189617A1 (en) * | 2007-10-19 | 2009-07-30 | David Burns | Continuous subsurface heater temperature measurement |
US20090260823A1 (en) * | 2008-04-18 | 2009-10-22 | Robert George Prince-Wright | Mines and tunnels for use in treating subsurface hydrocarbon containing formations |
US20090283257A1 (en) * | 2008-05-18 | 2009-11-19 | Bj Services Company | Radio and microwave treatment of oil wells |
US7631691B2 (en) | 2003-06-24 | 2009-12-15 | Exxonmobil Upstream Research Company | Methods of treating a subterranean formation to convert organic matter into producible hydrocarbons |
US7669657B2 (en) | 2006-10-13 | 2010-03-02 | Exxonmobil Upstream Research Company | Enhanced shale oil production by in situ heating using hydraulically fractured producing wells |
US20100089586A1 (en) * | 2008-10-13 | 2010-04-15 | John Andrew Stanecki | Movable heaters for treating subsurface hydrocarbon containing formations |
US7831134B2 (en) | 2005-04-22 | 2010-11-09 | Shell Oil Company | Grouped exposed metal heaters |
US20100282460A1 (en) * | 2009-05-05 | 2010-11-11 | Stone Matthew T | Converting Organic Matter From A Subterranean Formation Into Producible Hydrocarbons By Controlling Production Operations Based On Availability Of One Or More Production Resources |
US7942203B2 (en) | 2003-04-24 | 2011-05-17 | Shell Oil Company | Thermal processes for subsurface formations |
US20110124228A1 (en) * | 2009-10-09 | 2011-05-26 | John Matthew Coles | Compacted coupling joint for coupling insulated conductors |
US20110132661A1 (en) * | 2009-10-09 | 2011-06-09 | Patrick Silas Harmason | Parallelogram coupling joint for coupling insulated conductors |
US20110134958A1 (en) * | 2009-10-09 | 2011-06-09 | Dhruv Arora | Methods for assessing a temperature in a subsurface formation |
US8082995B2 (en) | 2007-12-10 | 2011-12-27 | Exxonmobil Upstream Research Company | Optimization of untreated oil shale geometry to control subsidence |
US8104537B2 (en) | 2006-10-13 | 2012-01-31 | Exxonmobil Upstream Research Company | Method of developing subsurface freeze zone |
US8122955B2 (en) | 2007-05-15 | 2012-02-28 | Exxonmobil Upstream Research Company | Downhole burners for in situ conversion of organic-rich rock formations |
US8146664B2 (en) | 2007-05-25 | 2012-04-03 | Exxonmobil Upstream Research Company | Utilization of low BTU gas generated during in situ heating of organic-rich rock |
US8151884B2 (en) | 2006-10-13 | 2012-04-10 | Exxonmobil Upstream Research Company | Combined development of oil shale by in situ heating with a deeper hydrocarbon resource |
US8151877B2 (en) | 2007-05-15 | 2012-04-10 | Exxonmobil Upstream Research Company | Downhole burner wells for in situ conversion of organic-rich rock formations |
US8224163B2 (en) | 2002-10-24 | 2012-07-17 | Shell Oil Company | Variable frequency temperature limited heaters |
US8230929B2 (en) | 2008-05-23 | 2012-07-31 | Exxonmobil Upstream Research Company | Methods of producing hydrocarbons for substantially constant composition gas generation |
US8327932B2 (en) | 2009-04-10 | 2012-12-11 | Shell Oil Company | Recovering energy from a subsurface formation |
WO2012177346A1 (en) * | 2011-06-23 | 2012-12-27 | Exxonmobil Upstream Research Company | Electrically conductive methods for in situ pyrolysis of organic-rich rock formations |
US8355623B2 (en) | 2004-04-23 | 2013-01-15 | Shell Oil Company | Temperature limited heaters with high power factors |
US8485256B2 (en) | 2010-04-09 | 2013-07-16 | Shell Oil Company | Variable thickness insulated conductors |
US8586867B2 (en) | 2010-10-08 | 2013-11-19 | Shell Oil Company | End termination for three-phase insulated conductors |
US8596355B2 (en) | 2003-06-24 | 2013-12-03 | Exxonmobil Upstream Research Company | Optimized well spacing for in situ shale oil development |
US8616279B2 (en) | 2009-02-23 | 2013-12-31 | Exxonmobil Upstream Research Company | Water treatment following shale oil production by in situ heating |
US8616280B2 (en) | 2010-08-30 | 2013-12-31 | Exxonmobil Upstream Research Company | Wellbore mechanical integrity for in situ pyrolysis |
US8622127B2 (en) | 2010-08-30 | 2014-01-07 | Exxonmobil Upstream Research Company | Olefin reduction for in situ pyrolysis oil generation |
US8622133B2 (en) | 2007-03-22 | 2014-01-07 | Exxonmobil Upstream Research Company | Resistive heater for in situ formation heating |
US8631866B2 (en) | 2010-04-09 | 2014-01-21 | Shell Oil Company | Leak detection in circulated fluid systems for heating subsurface formations |
US8641150B2 (en) | 2006-04-21 | 2014-02-04 | Exxonmobil Upstream Research Company | In situ co-development of oil shale with mineral recovery |
US8701768B2 (en) | 2010-04-09 | 2014-04-22 | Shell Oil Company | Methods for treating hydrocarbon formations |
US8770284B2 (en) | 2012-05-04 | 2014-07-08 | Exxonmobil Upstream Research Company | Systems and methods of detecting an intersection between a wellbore and a subterranean structure that includes a marker material |
US8820406B2 (en) | 2010-04-09 | 2014-09-02 | Shell Oil Company | Electrodes for electrical current flow heating of subsurface formations with conductive material in wellbore |
US8857051B2 (en) | 2010-10-08 | 2014-10-14 | Shell Oil Company | System and method for coupling lead-in conductor to insulated conductor |
US8863839B2 (en) | 2009-12-17 | 2014-10-21 | Exxonmobil Upstream Research Company | Enhanced convection for in situ pyrolysis of organic-rich rock formations |
US8875789B2 (en) | 2007-05-25 | 2014-11-04 | Exxonmobil Upstream Research Company | Process for producing hydrocarbon fluids combining in situ heating, a power plant and a gas plant |
US8939207B2 (en) | 2010-04-09 | 2015-01-27 | Shell Oil Company | Insulated conductor heaters with semiconductor layers |
US8943686B2 (en) | 2010-10-08 | 2015-02-03 | Shell Oil Company | Compaction of electrical insulation for joining insulated conductors |
US9016370B2 (en) | 2011-04-08 | 2015-04-28 | Shell Oil Company | Partial solution mining of hydrocarbon containing layers prior to in situ heat treatment |
US9033042B2 (en) | 2010-04-09 | 2015-05-19 | Shell Oil Company | Forming bitumen barriers in subsurface hydrocarbon formations |
US9048653B2 (en) | 2011-04-08 | 2015-06-02 | Shell Oil Company | Systems for joining insulated conductors |
US9080441B2 (en) | 2011-11-04 | 2015-07-14 | Exxonmobil Upstream Research Company | Multiple electrical connections to optimize heating for in situ pyrolysis |
US9080917B2 (en) | 2011-10-07 | 2015-07-14 | Shell Oil Company | System and methods for using dielectric properties of an insulated conductor in a subsurface formation to assess properties of the insulated conductor |
US9080409B2 (en) | 2011-10-07 | 2015-07-14 | Shell Oil Company | Integral splice for insulated conductors |
US9226341B2 (en) | 2011-10-07 | 2015-12-29 | Shell Oil Company | Forming insulated conductors using a final reduction step after heat treating |
US9309755B2 (en) | 2011-10-07 | 2016-04-12 | Shell Oil Company | Thermal expansion accommodation for circulated fluid systems used to heat subsurface formations |
US9394772B2 (en) | 2013-11-07 | 2016-07-19 | Exxonmobil Upstream Research Company | Systems and methods for in situ resistive heating of organic matter in a subterranean formation |
US9512699B2 (en) | 2013-10-22 | 2016-12-06 | Exxonmobil Upstream Research Company | Systems and methods for regulating an in situ pyrolysis process |
US9644466B2 (en) | 2014-11-21 | 2017-05-09 | Exxonmobil Upstream Research Company | Method of recovering hydrocarbons within a subsurface formation using electric current |
US10047594B2 (en) | 2012-01-23 | 2018-08-14 | Genie Ip B.V. | Heater pattern for in situ thermal processing of a subsurface hydrocarbon containing formation |
US10641079B2 (en) | 2018-05-08 | 2020-05-05 | Saudi Arabian Oil Company | Solidifying filler material for well-integrity issues |
US10941644B2 (en) | 2018-02-20 | 2021-03-09 | Saudi Arabian Oil Company | Downhole well integrity reconstruction in the hydrocarbon industry |
US11125075B1 (en) | 2020-03-25 | 2021-09-21 | Saudi Arabian Oil Company | Wellbore fluid level monitoring system |
US11149510B1 (en) | 2020-06-03 | 2021-10-19 | Saudi Arabian Oil Company | Freeing a stuck pipe from a wellbore |
US11187068B2 (en) | 2019-01-31 | 2021-11-30 | Saudi Arabian Oil Company | Downhole tools for controlled fracture initiation and stimulation |
US11255130B2 (en) | 2020-07-22 | 2022-02-22 | Saudi Arabian Oil Company | Sensing drill bit wear under downhole conditions |
US11280178B2 (en) | 2020-03-25 | 2022-03-22 | Saudi Arabian Oil Company | Wellbore fluid level monitoring system |
US11391104B2 (en) | 2020-06-03 | 2022-07-19 | Saudi Arabian Oil Company | Freeing a stuck pipe from a wellbore |
US11414984B2 (en) | 2020-05-28 | 2022-08-16 | Saudi Arabian Oil Company | Measuring wellbore cross-sections using downhole caliper tools |
US11414963B2 (en) | 2020-03-25 | 2022-08-16 | Saudi Arabian Oil Company | Wellbore fluid level monitoring system |
US11414985B2 (en) | 2020-05-28 | 2022-08-16 | Saudi Arabian Oil Company | Measuring wellbore cross-sections using downhole caliper tools |
US11434714B2 (en) | 2021-01-04 | 2022-09-06 | Saudi Arabian Oil Company | Adjustable seal for sealing a fluid flow at a wellhead |
US11506044B2 (en) | 2020-07-23 | 2022-11-22 | Saudi Arabian Oil Company | Automatic analysis of drill string dynamics |
US11572752B2 (en) | 2021-02-24 | 2023-02-07 | Saudi Arabian Oil Company | Downhole cable deployment |
US11619097B2 (en) | 2021-05-24 | 2023-04-04 | Saudi Arabian Oil Company | System and method for laser downhole extended sensing |
US11624265B1 (en) | 2021-11-12 | 2023-04-11 | Saudi Arabian Oil Company | Cutting pipes in wellbores using downhole autonomous jet cutting tools |
US11631884B2 (en) | 2020-06-02 | 2023-04-18 | Saudi Arabian Oil Company | Electrolyte structure for a high-temperature, high-pressure lithium battery |
US11642709B1 (en) | 2021-03-04 | 2023-05-09 | Trs Group, Inc. | Optimized flux ERH electrode |
US11697991B2 (en) | 2021-01-13 | 2023-07-11 | Saudi Arabian Oil Company | Rig sensor testing and calibration |
US11719089B2 (en) | 2020-07-15 | 2023-08-08 | Saudi Arabian Oil Company | Analysis of drilling slurry solids by image processing |
US11725504B2 (en) | 2021-05-24 | 2023-08-15 | Saudi Arabian Oil Company | Contactless real-time 3D mapping of surface equipment |
US11727555B2 (en) | 2021-02-25 | 2023-08-15 | Saudi Arabian Oil Company | Rig power system efficiency optimization through image processing |
US11739616B1 (en) | 2022-06-02 | 2023-08-29 | Saudi Arabian Oil Company | Forming perforation tunnels in a subterranean formation |
US11846151B2 (en) | 2021-03-09 | 2023-12-19 | Saudi Arabian Oil Company | Repairing a cased wellbore |
US11867008B2 (en) | 2020-11-05 | 2024-01-09 | Saudi Arabian Oil Company | System and methods for the measurement of drilling mud flow in real-time |
US11867012B2 (en) | 2021-12-06 | 2024-01-09 | Saudi Arabian Oil Company | Gauge cutter and sampler apparatus |
US11954800B2 (en) | 2021-12-14 | 2024-04-09 | Saudi Arabian Oil Company | Converting borehole images into three dimensional structures for numerical modeling and simulation applications |
US11979950B2 (en) | 2020-02-18 | 2024-05-07 | Trs Group, Inc. | Heater for contaminant remediation |
US12203366B2 (en) | 2023-05-02 | 2025-01-21 | Saudi Arabian Oil Company | Collecting samples from wellbores |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US849524A (en) * | 1902-06-23 | 1907-04-09 | Delos R Baker | Process of extracting and recovering the volatilizable contents of sedimentary mineral strata. |
US2634961A (en) * | 1946-01-07 | 1953-04-14 | Svensk Skifferolje Aktiebolage | Method of electrothermal production of shale oil |
US2795279A (en) * | 1952-04-17 | 1957-06-11 | Electrotherm Res Corp | Method of underground electrolinking and electrocarbonization of mineral fuels |
US2801090A (en) * | 1956-04-02 | 1957-07-30 | Exxon Research Engineering Co | Sulfur mining using heating by electrolysis |
-
1962
- 1962-05-04 US US192565A patent/US3149672A/en not_active Expired - Lifetime
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US849524A (en) * | 1902-06-23 | 1907-04-09 | Delos R Baker | Process of extracting and recovering the volatilizable contents of sedimentary mineral strata. |
US2634961A (en) * | 1946-01-07 | 1953-04-14 | Svensk Skifferolje Aktiebolage | Method of electrothermal production of shale oil |
US2795279A (en) * | 1952-04-17 | 1957-06-11 | Electrotherm Res Corp | Method of underground electrolinking and electrocarbonization of mineral fuels |
US2801090A (en) * | 1956-04-02 | 1957-07-30 | Exxon Research Engineering Co | Sulfur mining using heating by electrolysis |
Cited By (351)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3417823A (en) * | 1966-12-22 | 1968-12-24 | Mobil Oil Corp | Well treating process using electroosmosis |
US3507330A (en) * | 1968-09-30 | 1970-04-21 | Electrothermic Co | Method and apparatus for secondary recovery of oil |
US3642066A (en) * | 1969-11-13 | 1972-02-15 | Electrothermic Co | Electrical method and apparatus for the recovery of oil |
US3620300A (en) * | 1970-04-20 | 1971-11-16 | Electrothermic Co | Method and apparatus for electrically heating a subsurface formation |
US3862662A (en) * | 1973-12-12 | 1975-01-28 | Atlantic Richfield Co | Method and apparatus for electrical heating of hydrocarbonaceous formations |
US4084639A (en) * | 1976-12-16 | 1978-04-18 | Petro Canada Exploration Inc. | Electrode well for electrically heating a subterranean formation |
US4401162A (en) * | 1981-10-13 | 1983-08-30 | Synfuel (An Indiana Limited Partnership) | In situ oil shale process |
US4495990A (en) * | 1982-09-29 | 1985-01-29 | Electro-Petroleum, Inc. | Apparatus for passing electrical current through an underground formation |
US4886118A (en) * | 1983-03-21 | 1989-12-12 | Shell Oil Company | Conductively heating a subterranean oil shale to create permeability and subsequently produce oil |
US4524827A (en) * | 1983-04-29 | 1985-06-25 | Iit Research Institute | Single well stimulation for the recovery of liquid hydrocarbons from subsurface formations |
US4567945A (en) * | 1983-12-27 | 1986-02-04 | Atlantic Richfield Co. | Electrode well method and apparatus |
US4662438A (en) * | 1985-07-19 | 1987-05-05 | Uentech Corporation | Method and apparatus for enhancing liquid hydrocarbon production from a single borehole in a slowly producing formation by non-uniform heating through optimized electrode arrays surrounding the borehole |
US4705108A (en) * | 1986-05-27 | 1987-11-10 | The United States Of America As Represented By The United States Department Of Energy | Method for in situ heating of hydrocarbonaceous formations |
US5101899A (en) * | 1989-12-14 | 1992-04-07 | International Royal & Oil Company | Recovery of petroleum by electro-mechanical vibration |
US5713415A (en) * | 1995-03-01 | 1998-02-03 | Uentech Corporation | Low flux leakage cables and cable terminations for A.C. electrical heating of oil deposits |
US6328102B1 (en) | 1995-12-01 | 2001-12-11 | John C. Dean | Method and apparatus for piezoelectric transport |
US6199634B1 (en) | 1998-08-27 | 2001-03-13 | Viatchelav Ivanovich Selyakov | Method and apparatus for controlling the permeability of mineral bearing earth formations |
US6752210B2 (en) | 2000-04-24 | 2004-06-22 | Shell Oil Company | In situ thermal processing of a coal formation using heat sources positioned within open wellbores |
US6871707B2 (en) | 2000-04-24 | 2005-03-29 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation with carbon dioxide sequestration |
US6588504B2 (en) | 2000-04-24 | 2003-07-08 | Shell Oil Company | In situ thermal processing of a coal formation to produce nitrogen and/or sulfur containing formation fluids |
US6591907B2 (en) | 2000-04-24 | 2003-07-15 | Shell Oil Company | In situ thermal processing of a coal formation with a selected vitrinite reflectance |
US6591906B2 (en) | 2000-04-24 | 2003-07-15 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation with a selected oxygen content |
US7798221B2 (en) | 2000-04-24 | 2010-09-21 | Shell Oil Company | In situ recovery from a hydrocarbon containing formation |
US8225866B2 (en) | 2000-04-24 | 2012-07-24 | Shell Oil Company | In situ recovery from a hydrocarbon containing formation |
US8485252B2 (en) | 2000-04-24 | 2013-07-16 | Shell Oil Company | In situ recovery from a hydrocarbon containing formation |
US8789586B2 (en) | 2000-04-24 | 2014-07-29 | Shell Oil Company | In situ recovery from a hydrocarbon containing formation |
US6607033B2 (en) | 2000-04-24 | 2003-08-19 | Shell Oil Company | In Situ thermal processing of a coal formation to produce a condensate |
US6609570B2 (en) | 2000-04-24 | 2003-08-26 | Shell Oil Company | In situ thermal processing of a coal formation and ammonia production |
US6688387B1 (en) | 2000-04-24 | 2004-02-10 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation to produce a hydrocarbon condensate |
US6698515B2 (en) | 2000-04-24 | 2004-03-02 | Shell Oil Company | In situ thermal processing of a coal formation using a relatively slow heating rate |
US6702016B2 (en) | 2000-04-24 | 2004-03-09 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation with heat sources located at an edge of a formation layer |
US6708758B2 (en) | 2000-04-24 | 2004-03-23 | Shell Oil Company | In situ thermal processing of a coal formation leaving one or more selected unprocessed areas |
US6712135B2 (en) | 2000-04-24 | 2004-03-30 | Shell Oil Company | In situ thermal processing of a coal formation in reducing environment |
US6712137B2 (en) | 2000-04-24 | 2004-03-30 | Shell Oil Company | In situ thermal processing of a coal formation to pyrolyze a selected percentage of hydrocarbon material |
US6712136B2 (en) | 2000-04-24 | 2004-03-30 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation using a selected production well spacing |
US6715547B2 (en) | 2000-04-24 | 2004-04-06 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation to form a substantially uniform, high permeability formation |
US6715549B2 (en) | 2000-04-24 | 2004-04-06 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation with a selected atomic oxygen to carbon ratio |
US6715546B2 (en) | 2000-04-24 | 2004-04-06 | Shell Oil Company | In situ production of synthesis gas from a hydrocarbon containing formation through a heat source wellbore |
US6715548B2 (en) | 2000-04-24 | 2004-04-06 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation to produce nitrogen containing formation fluids |
US6719047B2 (en) | 2000-04-24 | 2004-04-13 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation in a hydrogen-rich environment |
US6722431B2 (en) | 2000-04-24 | 2004-04-20 | Shell Oil Company | In situ thermal processing of hydrocarbons within a relatively permeable formation |
US6722430B2 (en) | 2000-04-24 | 2004-04-20 | Shell Oil Company | In situ thermal processing of a coal formation with a selected oxygen content and/or selected O/C ratio |
US6722429B2 (en) | 2000-04-24 | 2004-04-20 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation leaving one or more selected unprocessed areas |
US6725928B2 (en) | 2000-04-24 | 2004-04-27 | Shell Oil Company | In situ thermal processing of a coal formation using a distributed combustor |
US6725921B2 (en) | 2000-04-24 | 2004-04-27 | Shell Oil Company | In situ thermal processing of a coal formation by controlling a pressure of the formation |
US6725920B2 (en) | 2000-04-24 | 2004-04-27 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation to convert a selected amount of total organic carbon into hydrocarbon products |
US6729397B2 (en) | 2000-04-24 | 2004-05-04 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation with a selected vitrinite reflectance |
US6729396B2 (en) | 2000-04-24 | 2004-05-04 | Shell Oil Company | In situ thermal processing of a coal formation to produce hydrocarbons having a selected carbon number range |
US6729395B2 (en) | 2000-04-24 | 2004-05-04 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation with a selected ratio of heat sources to production wells |
US6729401B2 (en) | 2000-04-24 | 2004-05-04 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation and ammonia production |
US6732794B2 (en) | 2000-04-24 | 2004-05-11 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation to produce a mixture with a selected hydrogen content |
US6732796B2 (en) | 2000-04-24 | 2004-05-11 | Shell Oil Company | In situ production of synthesis gas from a hydrocarbon containing formation, the synthesis gas having a selected H2 to CO ratio |
US6732795B2 (en) | 2000-04-24 | 2004-05-11 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation to pyrolyze a selected percentage of hydrocarbon material |
US6736215B2 (en) | 2000-04-24 | 2004-05-18 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation, in situ production of synthesis gas, and carbon dioxide sequestration |
US6739393B2 (en) | 2000-04-24 | 2004-05-25 | Shell Oil Company | In situ thermal processing of a coal formation and tuning production |
US6739394B2 (en) | 2000-04-24 | 2004-05-25 | Shell Oil Company | Production of synthesis gas from a hydrocarbon containing formation |
US6742589B2 (en) | 2000-04-24 | 2004-06-01 | Shell Oil Company | In situ thermal processing of a coal formation using repeating triangular patterns of heat sources |
US6742593B2 (en) | 2000-04-24 | 2004-06-01 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation using heat transfer from a heat transfer fluid to heat the formation |
US6742587B2 (en) | 2000-04-24 | 2004-06-01 | Shell Oil Company | In situ thermal processing of a coal formation to form a substantially uniform, relatively high permeable formation |
US6742588B2 (en) | 2000-04-24 | 2004-06-01 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation to produce formation fluids having a relatively low olefin content |
US6745832B2 (en) | 2000-04-24 | 2004-06-08 | Shell Oil Company | Situ thermal processing of a hydrocarbon containing formation to control product composition |
US6745837B2 (en) | 2000-04-24 | 2004-06-08 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation using a controlled heating rate |
US6745831B2 (en) | 2000-04-24 | 2004-06-08 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation by controlling a pressure of the formation |
US6749021B2 (en) | 2000-04-24 | 2004-06-15 | Shell Oil Company | In situ thermal processing of a coal formation using a controlled heating rate |
US7096941B2 (en) | 2000-04-24 | 2006-08-29 | Shell Oil Company | In situ thermal processing of a coal formation with heat sources located at an edge of a coal layer |
US6758268B2 (en) | 2000-04-24 | 2004-07-06 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation using a relatively slow heating rate |
US6761216B2 (en) | 2000-04-24 | 2004-07-13 | Shell Oil Company | In situ thermal processing of a coal formation to produce hydrocarbon fluids and synthesis gas |
US6763886B2 (en) | 2000-04-24 | 2004-07-20 | Shell Oil Company | In situ thermal processing of a coal formation with carbon dioxide sequestration |
US6769483B2 (en) | 2000-04-24 | 2004-08-03 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation using conductor in conduit heat sources |
US6769485B2 (en) | 2000-04-24 | 2004-08-03 | Shell Oil Company | In situ production of synthesis gas from a coal formation through a heat source wellbore |
US6789625B2 (en) | 2000-04-24 | 2004-09-14 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation using exposed metal heat sources |
US6805195B2 (en) | 2000-04-24 | 2004-10-19 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation to produce hydrocarbon fluids and synthesis gas |
US6820688B2 (en) | 2000-04-24 | 2004-11-23 | Shell Oil Company | In situ thermal processing of coal formation with a selected hydrogen content and/or selected H/C ratio |
US6866097B2 (en) | 2000-04-24 | 2005-03-15 | Shell Oil Company | In situ thermal processing of a coal formation to increase a permeability/porosity of the formation |
US6581684B2 (en) | 2000-04-24 | 2003-06-24 | Shell Oil Company | In Situ thermal processing of a hydrocarbon containing formation to produce sulfur containing formation fluids |
US6877554B2 (en) | 2000-04-24 | 2005-04-12 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation using pressure and/or temperature control |
US6880635B2 (en) | 2000-04-24 | 2005-04-19 | Shell Oil Company | In situ production of synthesis gas from a coal formation, the synthesis gas having a selected H2 to CO ratio |
US6889769B2 (en) | 2000-04-24 | 2005-05-10 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation with a selected moisture content |
US6896053B2 (en) | 2000-04-24 | 2005-05-24 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation using repeating triangular patterns of heat sources |
US6902004B2 (en) | 2000-04-24 | 2005-06-07 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation using a movable heating element |
US6902003B2 (en) | 2000-04-24 | 2005-06-07 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation having a selected total organic carbon content |
US6910536B2 (en) | 2000-04-24 | 2005-06-28 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation using a natural distributed combustor |
US6913078B2 (en) | 2000-04-24 | 2005-07-05 | Shell Oil Company | In Situ thermal processing of hydrocarbons within a relatively impermeable formation |
US6923258B2 (en) | 2000-04-24 | 2005-08-02 | Shell Oil Company | In situ thermal processsing of a hydrocarbon containing formation to produce a mixture with a selected hydrogen content |
US6948563B2 (en) | 2000-04-24 | 2005-09-27 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation with a selected hydrogen content |
US6953087B2 (en) | 2000-04-24 | 2005-10-11 | Shell Oil Company | Thermal processing of a hydrocarbon containing formation to increase a permeability of the formation |
US6959761B2 (en) | 2000-04-24 | 2005-11-01 | Shell Oil Company | In situ thermal processing of a coal formation with a selected ratio of heat sources to production wells |
US6966372B2 (en) | 2000-04-24 | 2005-11-22 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation to produce oxygen containing formation fluids |
US7096953B2 (en) | 2000-04-24 | 2006-08-29 | Shell Oil Company | In situ thermal processing of a coal formation using a movable heating element |
US6973967B2 (en) | 2000-04-24 | 2005-12-13 | Shell Oil Company | Situ thermal processing of a coal formation using pressure and/or temperature control |
US6991031B2 (en) | 2000-04-24 | 2006-01-31 | Shell Oil Company | In situ thermal processing of a coal formation to convert a selected total organic carbon content into hydrocarbon products |
US6994168B2 (en) * | 2000-04-24 | 2006-02-07 | Scott Lee Wellington | In situ thermal processing of a hydrocarbon containing formation with a selected hydrogen to carbon ratio |
US6994160B2 (en) | 2000-04-24 | 2006-02-07 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation to produce hydrocarbons having a selected carbon number range |
US7086468B2 (en) | 2000-04-24 | 2006-08-08 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation using heat sources positioned within open wellbores |
US6994161B2 (en) | 2000-04-24 | 2006-02-07 | Kevin Albert Maher | In situ thermal processing of a coal formation with a selected moisture content |
US6997255B2 (en) | 2000-04-24 | 2006-02-14 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation in a reducing environment |
US7036583B2 (en) | 2000-04-24 | 2006-05-02 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation to increase a porosity of the formation |
US7017661B2 (en) | 2000-04-24 | 2006-03-28 | Shell Oil Company | Production of synthesis gas from a coal formation |
US6607036B2 (en) * | 2001-03-01 | 2003-08-19 | Intevep, S.A. | Method for heating subterranean formation, particularly for heating reservoir fluids in near well bore zone |
US20020121374A1 (en) * | 2001-03-01 | 2002-09-05 | Aaron Ranson | Method for heating subterranean formation, particularly for heating reservoir fluids in near well bore zone |
US20030131995A1 (en) * | 2001-04-24 | 2003-07-17 | De Rouffignac Eric Pierre | In situ thermal processing of a relatively impermeable formation to increase permeability of the formation |
US6994169B2 (en) | 2001-04-24 | 2006-02-07 | Shell Oil Company | In situ thermal processing of an oil shale formation with a selected property |
US7735935B2 (en) | 2001-04-24 | 2010-06-15 | Shell Oil Company | In situ thermal processing of an oil shale formation containing carbonate minerals |
US20030146002A1 (en) * | 2001-04-24 | 2003-08-07 | Vinegar Harold J. | Removable heat sources for in situ thermal processing of an oil shale formation |
US8608249B2 (en) | 2001-04-24 | 2013-12-17 | Shell Oil Company | In situ thermal processing of an oil shale formation |
US20030131993A1 (en) * | 2001-04-24 | 2003-07-17 | Etuan Zhang | In situ thermal processing of an oil shale formation with a selected property |
US7004247B2 (en) | 2001-04-24 | 2006-02-28 | Shell Oil Company | Conductor-in-conduit heat sources for in situ thermal processing of an oil shale formation |
US7032660B2 (en) | 2001-04-24 | 2006-04-25 | Shell Oil Company | In situ thermal processing and inhibiting migration of fluids into or out of an in situ oil shale formation |
US6969123B2 (en) | 2001-10-24 | 2005-11-29 | Shell Oil Company | Upgrading and mining of coal |
US7077198B2 (en) | 2001-10-24 | 2006-07-18 | Shell Oil Company | In situ recovery from a hydrocarbon containing formation using barriers |
US8627887B2 (en) | 2001-10-24 | 2014-01-14 | Shell Oil Company | In situ recovery from a hydrocarbon containing formation |
US8238730B2 (en) | 2002-10-24 | 2012-08-07 | Shell Oil Company | High voltage temperature limited heaters |
US8224164B2 (en) | 2002-10-24 | 2012-07-17 | Shell Oil Company | Insulated conductor temperature limited heaters |
US8224163B2 (en) | 2002-10-24 | 2012-07-17 | Shell Oil Company | Variable frequency temperature limited heaters |
US7942203B2 (en) | 2003-04-24 | 2011-05-17 | Shell Oil Company | Thermal processes for subsurface formations |
US8579031B2 (en) | 2003-04-24 | 2013-11-12 | Shell Oil Company | Thermal processes for subsurface formations |
US20100078169A1 (en) * | 2003-06-24 | 2010-04-01 | Symington William A | Methods of Treating Suberranean Formation To Convert Organic Matter Into Producible Hydrocarbons |
US7331385B2 (en) | 2003-06-24 | 2008-02-19 | Exxonmobil Upstream Research Company | Methods of treating a subterranean formation to convert organic matter into producible hydrocarbons |
US7631691B2 (en) | 2003-06-24 | 2009-12-15 | Exxonmobil Upstream Research Company | Methods of treating a subterranean formation to convert organic matter into producible hydrocarbons |
US8596355B2 (en) | 2003-06-24 | 2013-12-03 | Exxonmobil Upstream Research Company | Optimized well spacing for in situ shale oil development |
US20070000662A1 (en) * | 2003-06-24 | 2007-01-04 | Symington William A | Methods of treating a subterranean formation to convert organic matter into producible hydrocarbons |
US8355623B2 (en) | 2004-04-23 | 2013-01-15 | Shell Oil Company | Temperature limited heaters with high power factors |
US7986869B2 (en) | 2005-04-22 | 2011-07-26 | Shell Oil Company | Varying properties along lengths of temperature limited heaters |
US8230927B2 (en) | 2005-04-22 | 2012-07-31 | Shell Oil Company | Methods and systems for producing fluid from an in situ conversion process |
US8027571B2 (en) | 2005-04-22 | 2011-09-27 | Shell Oil Company | In situ conversion process systems utilizing wellbores in at least two regions of a formation |
US7942197B2 (en) | 2005-04-22 | 2011-05-17 | Shell Oil Company | Methods and systems for producing fluid from an in situ conversion process |
US7860377B2 (en) | 2005-04-22 | 2010-12-28 | Shell Oil Company | Subsurface connection methods for subsurface heaters |
US7831134B2 (en) | 2005-04-22 | 2010-11-09 | Shell Oil Company | Grouped exposed metal heaters |
US8070840B2 (en) | 2005-04-22 | 2011-12-06 | Shell Oil Company | Treatment of gas from an in situ conversion process |
US8224165B2 (en) | 2005-04-22 | 2012-07-17 | Shell Oil Company | Temperature limited heater utilizing non-ferromagnetic conductor |
US8233782B2 (en) | 2005-04-22 | 2012-07-31 | Shell Oil Company | Grouped exposed metal heaters |
US8606091B2 (en) | 2005-10-24 | 2013-12-10 | Shell Oil Company | Subsurface heaters with low sulfidation rates |
US8151880B2 (en) | 2005-10-24 | 2012-04-10 | Shell Oil Company | Methods of making transportation fuel |
US20080107577A1 (en) * | 2005-10-24 | 2008-05-08 | Vinegar Harold J | Varying heating in dawsonite zones in hydrocarbon containing formations |
US7912358B2 (en) | 2006-04-21 | 2011-03-22 | Shell Oil Company | Alternate energy source usage for in situ heat treatment processes |
US7683296B2 (en) | 2006-04-21 | 2010-03-23 | Shell Oil Company | Adjusting alloy compositions for selected properties in temperature limited heaters |
US20080173442A1 (en) * | 2006-04-21 | 2008-07-24 | Vinegar Harold J | Sulfur barrier for use with in situ processes for treating formations |
US20080173444A1 (en) * | 2006-04-21 | 2008-07-24 | Francis Marion Stone | Alternate energy source usage for in situ heat treatment processes |
US20080173450A1 (en) * | 2006-04-21 | 2008-07-24 | Bernard Goldberg | Time sequenced heating of multiple layers in a hydrocarbon containing formation |
US20080174115A1 (en) * | 2006-04-21 | 2008-07-24 | Gene Richard Lambirth | Power systems utilizing the heat of produced formation fluid |
US8192682B2 (en) | 2006-04-21 | 2012-06-05 | Shell Oil Company | High strength alloys |
US20080038144A1 (en) * | 2006-04-21 | 2008-02-14 | Maziasz Phillip J | High strength alloys |
US8857506B2 (en) | 2006-04-21 | 2014-10-14 | Shell Oil Company | Alternate energy source usage methods for in situ heat treatment processes |
US7785427B2 (en) | 2006-04-21 | 2010-08-31 | Shell Oil Company | High strength alloys |
US8083813B2 (en) | 2006-04-21 | 2011-12-27 | Shell Oil Company | Methods of producing transportation fuel |
US8641150B2 (en) | 2006-04-21 | 2014-02-04 | Exxonmobil Upstream Research Company | In situ co-development of oil shale with mineral recovery |
US20080035346A1 (en) * | 2006-04-21 | 2008-02-14 | Vijay Nair | Methods of producing transportation fuel |
US20080035348A1 (en) * | 2006-04-21 | 2008-02-14 | Vitek John M | Temperature limited heaters using phase transformation of ferromagnetic material |
US7866385B2 (en) | 2006-04-21 | 2011-01-11 | Shell Oil Company | Power systems utilizing the heat of produced formation fluid |
US7673786B2 (en) | 2006-04-21 | 2010-03-09 | Shell Oil Company | Welding shield for coupling heaters |
US7793722B2 (en) | 2006-04-21 | 2010-09-14 | Shell Oil Company | Non-ferromagnetic overburden casing |
US7669657B2 (en) | 2006-10-13 | 2010-03-02 | Exxonmobil Upstream Research Company | Enhanced shale oil production by in situ heating using hydraulically fractured producing wells |
US8104537B2 (en) | 2006-10-13 | 2012-01-31 | Exxonmobil Upstream Research Company | Method of developing subsurface freeze zone |
US8151884B2 (en) | 2006-10-13 | 2012-04-10 | Exxonmobil Upstream Research Company | Combined development of oil shale by in situ heating with a deeper hydrocarbon resource |
US8191630B2 (en) | 2006-10-20 | 2012-06-05 | Shell Oil Company | Creating fluid injectivity in tar sands formations |
US20080277113A1 (en) * | 2006-10-20 | 2008-11-13 | George Leo Stegemeier | Heating tar sands formations while controlling pressure |
US20080217004A1 (en) * | 2006-10-20 | 2008-09-11 | De Rouffignac Eric Pierre | Heating hydrocarbon containing formations in a checkerboard pattern staged process |
US7681647B2 (en) | 2006-10-20 | 2010-03-23 | Shell Oil Company | Method of producing drive fluid in situ in tar sands formations |
US20080142216A1 (en) * | 2006-10-20 | 2008-06-19 | Vinegar Harold J | Treating tar sands formations with dolomite |
US7703513B2 (en) | 2006-10-20 | 2010-04-27 | Shell Oil Company | Wax barrier for use with in situ processes for treating formations |
US20080128134A1 (en) * | 2006-10-20 | 2008-06-05 | Ramesh Raju Mudunuri | Producing drive fluid in situ in tar sands formations |
US20080135253A1 (en) * | 2006-10-20 | 2008-06-12 | Vinegar Harold J | Treating tar sands formations with karsted zones |
US7677314B2 (en) | 2006-10-20 | 2010-03-16 | Shell Oil Company | Method of condensing vaporized water in situ to treat tar sands formations |
US7717171B2 (en) | 2006-10-20 | 2010-05-18 | Shell Oil Company | Moving hydrocarbons through portions of tar sands formations with a fluid |
US7730946B2 (en) | 2006-10-20 | 2010-06-08 | Shell Oil Company | Treating tar sands formations with dolomite |
US7730947B2 (en) | 2006-10-20 | 2010-06-08 | Shell Oil Company | Creating fluid injectivity in tar sands formations |
US7730945B2 (en) | 2006-10-20 | 2010-06-08 | Shell Oil Company | Using geothermal energy to heat a portion of a formation for an in situ heat treatment process |
US20080135244A1 (en) * | 2006-10-20 | 2008-06-12 | David Scott Miller | Heating hydrocarbon containing formations in a line drive staged process |
US7677310B2 (en) | 2006-10-20 | 2010-03-16 | Shell Oil Company | Creating and maintaining a gas cap in tar sands formations |
US7673681B2 (en) | 2006-10-20 | 2010-03-09 | Shell Oil Company | Treating tar sands formations with karsted zones |
US20090014180A1 (en) * | 2006-10-20 | 2009-01-15 | George Leo Stegemeier | Moving hydrocarbons through portions of tar sands formations with a fluid |
US20080135254A1 (en) * | 2006-10-20 | 2008-06-12 | Vinegar Harold J | In situ heat treatment process utilizing a closed loop heating system |
US8555971B2 (en) | 2006-10-20 | 2013-10-15 | Shell Oil Company | Treating tar sands formations with dolomite |
US20090014181A1 (en) * | 2006-10-20 | 2009-01-15 | Vinegar Harold J | Creating and maintaining a gas cap in tar sands formations |
US7644765B2 (en) | 2006-10-20 | 2010-01-12 | Shell Oil Company | Heating tar sands formations while controlling pressure |
US7845411B2 (en) | 2006-10-20 | 2010-12-07 | Shell Oil Company | In situ heat treatment process utilizing a closed loop heating system |
US7841401B2 (en) | 2006-10-20 | 2010-11-30 | Shell Oil Company | Gas injection to inhibit migration during an in situ heat treatment process |
CN101641495B (en) * | 2007-03-22 | 2013-10-30 | 埃克森美孚上游研究公司 | Granular electrical connections for in situ formation heating |
WO2008115359A1 (en) * | 2007-03-22 | 2008-09-25 | Exxonmobil Upstream Research Company | Granular electrical connections for in situ formation heating |
US9347302B2 (en) | 2007-03-22 | 2016-05-24 | Exxonmobil Upstream Research Company | Resistive heater for in situ formation heating |
US8622133B2 (en) | 2007-03-22 | 2014-01-07 | Exxonmobil Upstream Research Company | Resistive heater for in situ formation heating |
AU2008227167B2 (en) * | 2007-03-22 | 2013-08-01 | Exxonmobil Upstream Research Company | Granular electrical connections for in situ formation heating |
US8087460B2 (en) | 2007-03-22 | 2012-01-03 | Exxonmobil Upstream Research Company | Granular electrical connections for in situ formation heating |
US20080271885A1 (en) * | 2007-03-22 | 2008-11-06 | Kaminsky Robert D | Granular electrical connections for in situ formation heating |
US7798220B2 (en) | 2007-04-20 | 2010-09-21 | Shell Oil Company | In situ heat treatment of a tar sands formation after drive process treatment |
US8381815B2 (en) | 2007-04-20 | 2013-02-26 | Shell Oil Company | Production from multiple zones of a tar sands formation |
US20090071652A1 (en) * | 2007-04-20 | 2009-03-19 | Vinegar Harold J | In situ heat treatment from multiple layers of a tar sands formation |
US8791396B2 (en) | 2007-04-20 | 2014-07-29 | Shell Oil Company | Floating insulated conductors for heating subsurface formations |
US20090084547A1 (en) * | 2007-04-20 | 2009-04-02 | Walter Farman Farmayan | Downhole burner systems and methods for heating subsurface formations |
US20090090509A1 (en) * | 2007-04-20 | 2009-04-09 | Vinegar Harold J | In situ recovery from residually heated sections in a hydrocarbon containing formation |
US7950453B2 (en) | 2007-04-20 | 2011-05-31 | Shell Oil Company | Downhole burner systems and methods for heating subsurface formations |
US8662175B2 (en) | 2007-04-20 | 2014-03-04 | Shell Oil Company | Varying properties of in situ heat treatment of a tar sands formation based on assessed viscosities |
US20090126929A1 (en) * | 2007-04-20 | 2009-05-21 | Vinegar Harold J | Treating nahcolite containing formations and saline zones |
US7841425B2 (en) | 2007-04-20 | 2010-11-30 | Shell Oil Company | Drilling subsurface wellbores with cutting structures |
US20090095476A1 (en) * | 2007-04-20 | 2009-04-16 | Scott Vinh Nguyen | Molten salt as a heat transfer fluid for heating a subsurface formation |
US20090095479A1 (en) * | 2007-04-20 | 2009-04-16 | John Michael Karanikas | Production from multiple zones of a tar sands formation |
US8042610B2 (en) | 2007-04-20 | 2011-10-25 | Shell Oil Company | Parallel heater system for subsurface formations |
US7931086B2 (en) | 2007-04-20 | 2011-04-26 | Shell Oil Company | Heating systems for heating subsurface formations |
US8327681B2 (en) | 2007-04-20 | 2012-12-11 | Shell Oil Company | Wellbore manufacturing processes for in situ heat treatment processes |
US7841408B2 (en) | 2007-04-20 | 2010-11-30 | Shell Oil Company | In situ heat treatment from multiple layers of a tar sands formation |
US7832484B2 (en) | 2007-04-20 | 2010-11-16 | Shell Oil Company | Molten salt as a heat transfer fluid for heating a subsurface formation |
US9181780B2 (en) | 2007-04-20 | 2015-11-10 | Shell Oil Company | Controlling and assessing pressure conditions during treatment of tar sands formations |
US20090078461A1 (en) * | 2007-04-20 | 2009-03-26 | Arthur James Mansure | Drilling subsurface wellbores with cutting structures |
US20090095477A1 (en) * | 2007-04-20 | 2009-04-16 | Scott Vinh Nguyen | Heating systems for heating subsurface formations |
US8459359B2 (en) | 2007-04-20 | 2013-06-11 | Shell Oil Company | Treating nahcolite containing formations and saline zones |
US7849922B2 (en) | 2007-04-20 | 2010-12-14 | Shell Oil Company | In situ recovery from residually heated sections in a hydrocarbon containing formation |
US8122955B2 (en) | 2007-05-15 | 2012-02-28 | Exxonmobil Upstream Research Company | Downhole burners for in situ conversion of organic-rich rock formations |
US8151877B2 (en) | 2007-05-15 | 2012-04-10 | Exxonmobil Upstream Research Company | Downhole burner wells for in situ conversion of organic-rich rock formations |
US8146664B2 (en) | 2007-05-25 | 2012-04-03 | Exxonmobil Upstream Research Company | Utilization of low BTU gas generated during in situ heating of organic-rich rock |
US8875789B2 (en) | 2007-05-25 | 2014-11-04 | Exxonmobil Upstream Research Company | Process for producing hydrocarbon fluids combining in situ heating, a power plant and a gas plant |
US20090200031A1 (en) * | 2007-10-19 | 2009-08-13 | David Scott Miller | Irregular spacing of heat sources for treating hydrocarbon containing formations |
US8146661B2 (en) | 2007-10-19 | 2012-04-03 | Shell Oil Company | Cryogenic treatment of gas |
US7866388B2 (en) | 2007-10-19 | 2011-01-11 | Shell Oil Company | High temperature methods for forming oxidizer fuel |
US8536497B2 (en) | 2007-10-19 | 2013-09-17 | Shell Oil Company | Methods for forming long subsurface heaters |
US7866386B2 (en) | 2007-10-19 | 2011-01-11 | Shell Oil Company | In situ oxidation of subsurface formations |
US8011451B2 (en) | 2007-10-19 | 2011-09-06 | Shell Oil Company | Ranging methods for developing wellbores in subsurface formations |
US20090200854A1 (en) * | 2007-10-19 | 2009-08-13 | Vinegar Harold J | Solution mining and in situ treatment of nahcolite beds |
US8196658B2 (en) | 2007-10-19 | 2012-06-12 | Shell Oil Company | Irregular spacing of heat sources for treating hydrocarbon containing formations |
US20090194329A1 (en) * | 2007-10-19 | 2009-08-06 | Rosalvina Ramona Guimerans | Methods for forming wellbores in heated formations |
US8162059B2 (en) | 2007-10-19 | 2012-04-24 | Shell Oil Company | Induction heaters used to heat subsurface formations |
US8276661B2 (en) | 2007-10-19 | 2012-10-02 | Shell Oil Company | Heating subsurface formations by oxidizing fuel on a fuel carrier |
US20090189617A1 (en) * | 2007-10-19 | 2009-07-30 | David Burns | Continuous subsurface heater temperature measurement |
US20090200025A1 (en) * | 2007-10-19 | 2009-08-13 | Jose Luis Bravo | High temperature methods for forming oxidizer fuel |
US20090194269A1 (en) * | 2007-10-19 | 2009-08-06 | Vinegar Harold J | Three-phase heaters with common overburden sections for heating subsurface formations |
US20090194282A1 (en) * | 2007-10-19 | 2009-08-06 | Gary Lee Beer | In situ oxidation of subsurface formations |
US8272455B2 (en) | 2007-10-19 | 2012-09-25 | Shell Oil Company | Methods for forming wellbores in heated formations |
US8146669B2 (en) | 2007-10-19 | 2012-04-03 | Shell Oil Company | Multi-step heater deployment in a subsurface formation |
US8240774B2 (en) | 2007-10-19 | 2012-08-14 | Shell Oil Company | Solution mining and in situ treatment of nahcolite beds |
US20090194524A1 (en) * | 2007-10-19 | 2009-08-06 | Dong Sub Kim | Methods for forming long subsurface heaters |
US8113272B2 (en) | 2007-10-19 | 2012-02-14 | Shell Oil Company | Three-phase heaters with common overburden sections for heating subsurface formations |
US8082995B2 (en) | 2007-12-10 | 2011-12-27 | Exxonmobil Upstream Research Company | Optimization of untreated oil shale geometry to control subsidence |
US8151907B2 (en) | 2008-04-18 | 2012-04-10 | Shell Oil Company | Dual motor systems and non-rotating sensors for use in developing wellbores in subsurface formations |
US8562078B2 (en) | 2008-04-18 | 2013-10-22 | Shell Oil Company | Hydrocarbon production from mines and tunnels used in treating subsurface hydrocarbon containing formations |
US9528322B2 (en) | 2008-04-18 | 2016-12-27 | Shell Oil Company | Dual motor systems and non-rotating sensors for use in developing wellbores in subsurface formations |
US20090260824A1 (en) * | 2008-04-18 | 2009-10-22 | David Booth Burns | Hydrocarbon production from mines and tunnels used in treating subsurface hydrocarbon containing formations |
US20090272578A1 (en) * | 2008-04-18 | 2009-11-05 | Macdonald Duncan Charles | Dual motor systems and non-rotating sensors for use in developing wellbores in subsurface formations |
US8636323B2 (en) | 2008-04-18 | 2014-01-28 | Shell Oil Company | Mines and tunnels for use in treating subsurface hydrocarbon containing formations |
US20090260823A1 (en) * | 2008-04-18 | 2009-10-22 | Robert George Prince-Wright | Mines and tunnels for use in treating subsurface hydrocarbon containing formations |
US20090272535A1 (en) * | 2008-04-18 | 2009-11-05 | David Booth Burns | Using tunnels for treating subsurface hydrocarbon containing formations |
US20090272533A1 (en) * | 2008-04-18 | 2009-11-05 | David Booth Burns | Heated fluid flow in mines and tunnels used in heating subsurface hydrocarbon containing formations |
US8752904B2 (en) | 2008-04-18 | 2014-06-17 | Shell Oil Company | Heated fluid flow in mines and tunnels used in heating subsurface hydrocarbon containing formations |
US8162405B2 (en) | 2008-04-18 | 2012-04-24 | Shell Oil Company | Using tunnels for treating subsurface hydrocarbon containing formations |
US8177305B2 (en) | 2008-04-18 | 2012-05-15 | Shell Oil Company | Heater connections in mines and tunnels for use in treating subsurface hydrocarbon containing formations |
US8172335B2 (en) | 2008-04-18 | 2012-05-08 | Shell Oil Company | Electrical current flow between tunnels for use in heating subsurface hydrocarbon containing formations |
US20090283257A1 (en) * | 2008-05-18 | 2009-11-19 | Bj Services Company | Radio and microwave treatment of oil wells |
US8230929B2 (en) | 2008-05-23 | 2012-07-31 | Exxonmobil Upstream Research Company | Methods of producing hydrocarbons for substantially constant composition gas generation |
US8353347B2 (en) | 2008-10-13 | 2013-01-15 | Shell Oil Company | Deployment of insulated conductors for treating subsurface formations |
US9129728B2 (en) | 2008-10-13 | 2015-09-08 | Shell Oil Company | Systems and methods of forming subsurface wellbores |
US20100096137A1 (en) * | 2008-10-13 | 2010-04-22 | Scott Vinh Nguyen | Circulated heated transfer fluid heating of subsurface hydrocarbon formations |
US8220539B2 (en) | 2008-10-13 | 2012-07-17 | Shell Oil Company | Controlling hydrogen pressure in self-regulating nuclear reactors used to treat a subsurface formation |
US20100101784A1 (en) * | 2008-10-13 | 2010-04-29 | Vinegar Harold J | Controlling hydrogen pressure in self-regulating nuclear reactors used to treat a subsurface formation |
US8256512B2 (en) | 2008-10-13 | 2012-09-04 | Shell Oil Company | Movable heaters for treating subsurface hydrocarbon containing formations |
US20100108310A1 (en) * | 2008-10-13 | 2010-05-06 | Thomas David Fowler | Offset barrier wells in subsurface formations |
US8881806B2 (en) | 2008-10-13 | 2014-11-11 | Shell Oil Company | Systems and methods for treating a subsurface formation with electrical conductors |
US20100089586A1 (en) * | 2008-10-13 | 2010-04-15 | John Andrew Stanecki | Movable heaters for treating subsurface hydrocarbon containing formations |
US20100101783A1 (en) * | 2008-10-13 | 2010-04-29 | Vinegar Harold J | Using self-regulating nuclear reactors in treating a subsurface formation |
US8281861B2 (en) | 2008-10-13 | 2012-10-09 | Shell Oil Company | Circulated heated transfer fluid heating of subsurface hydrocarbon formations |
US9051829B2 (en) | 2008-10-13 | 2015-06-09 | Shell Oil Company | Perforated electrical conductors for treating subsurface formations |
US9022118B2 (en) | 2008-10-13 | 2015-05-05 | Shell Oil Company | Double insulated heaters for treating subsurface formations |
US8267185B2 (en) | 2008-10-13 | 2012-09-18 | Shell Oil Company | Circulated heated transfer fluid systems used to treat a subsurface formation |
US8267170B2 (en) | 2008-10-13 | 2012-09-18 | Shell Oil Company | Offset barrier wells in subsurface formations |
US8261832B2 (en) | 2008-10-13 | 2012-09-11 | Shell Oil Company | Heating subsurface formations with fluids |
US8616279B2 (en) | 2009-02-23 | 2013-12-31 | Exxonmobil Upstream Research Company | Water treatment following shale oil production by in situ heating |
US8327932B2 (en) | 2009-04-10 | 2012-12-11 | Shell Oil Company | Recovering energy from a subsurface formation |
US8434555B2 (en) | 2009-04-10 | 2013-05-07 | Shell Oil Company | Irregular pattern treatment of a subsurface formation |
US8851170B2 (en) | 2009-04-10 | 2014-10-07 | Shell Oil Company | Heater assisted fluid treatment of a subsurface formation |
US8448707B2 (en) | 2009-04-10 | 2013-05-28 | Shell Oil Company | Non-conducting heater casings |
US20100282460A1 (en) * | 2009-05-05 | 2010-11-11 | Stone Matthew T | Converting Organic Matter From A Subterranean Formation Into Producible Hydrocarbons By Controlling Production Operations Based On Availability Of One Or More Production Resources |
US8540020B2 (en) | 2009-05-05 | 2013-09-24 | Exxonmobil Upstream Research Company | Converting organic matter from a subterranean formation into producible hydrocarbons by controlling production operations based on availability of one or more production resources |
US20110124228A1 (en) * | 2009-10-09 | 2011-05-26 | John Matthew Coles | Compacted coupling joint for coupling insulated conductors |
US8816203B2 (en) | 2009-10-09 | 2014-08-26 | Shell Oil Company | Compacted coupling joint for coupling insulated conductors |
US9466896B2 (en) | 2009-10-09 | 2016-10-11 | Shell Oil Company | Parallelogram coupling joint for coupling insulated conductors |
US8485847B2 (en) * | 2009-10-09 | 2013-07-16 | Shell Oil Company | Press-fit coupling joint for joining insulated conductors |
US20110132661A1 (en) * | 2009-10-09 | 2011-06-09 | Patrick Silas Harmason | Parallelogram coupling joint for coupling insulated conductors |
US20110124223A1 (en) * | 2009-10-09 | 2011-05-26 | David Jon Tilley | Press-fit coupling joint for joining insulated conductors |
US8257112B2 (en) | 2009-10-09 | 2012-09-04 | Shell Oil Company | Press-fit coupling joint for joining insulated conductors |
US8356935B2 (en) | 2009-10-09 | 2013-01-22 | Shell Oil Company | Methods for assessing a temperature in a subsurface formation |
US20110134958A1 (en) * | 2009-10-09 | 2011-06-09 | Dhruv Arora | Methods for assessing a temperature in a subsurface formation |
US8863839B2 (en) | 2009-12-17 | 2014-10-21 | Exxonmobil Upstream Research Company | Enhanced convection for in situ pyrolysis of organic-rich rock formations |
US9399905B2 (en) | 2010-04-09 | 2016-07-26 | Shell Oil Company | Leak detection in circulated fluid systems for heating subsurface formations |
US8739874B2 (en) | 2010-04-09 | 2014-06-03 | Shell Oil Company | Methods for heating with slots in hydrocarbon formations |
US8833453B2 (en) | 2010-04-09 | 2014-09-16 | Shell Oil Company | Electrodes for electrical current flow heating of subsurface formations with tapered copper thickness |
US8631866B2 (en) | 2010-04-09 | 2014-01-21 | Shell Oil Company | Leak detection in circulated fluid systems for heating subsurface formations |
US8859942B2 (en) | 2010-04-09 | 2014-10-14 | Shell Oil Company | Insulating blocks and methods for installation in insulated conductor heaters |
US8502120B2 (en) | 2010-04-09 | 2013-08-06 | Shell Oil Company | Insulating blocks and methods for installation in insulated conductor heaters |
US9033042B2 (en) | 2010-04-09 | 2015-05-19 | Shell Oil Company | Forming bitumen barriers in subsurface hydrocarbon formations |
US8820406B2 (en) | 2010-04-09 | 2014-09-02 | Shell Oil Company | Electrodes for electrical current flow heating of subsurface formations with conductive material in wellbore |
US9127538B2 (en) | 2010-04-09 | 2015-09-08 | Shell Oil Company | Methodologies for treatment of hydrocarbon formations using staged pyrolyzation |
US8485256B2 (en) | 2010-04-09 | 2013-07-16 | Shell Oil Company | Variable thickness insulated conductors |
US8939207B2 (en) | 2010-04-09 | 2015-01-27 | Shell Oil Company | Insulated conductor heaters with semiconductor layers |
US9127523B2 (en) | 2010-04-09 | 2015-09-08 | Shell Oil Company | Barrier methods for use in subsurface hydrocarbon formations |
US8967259B2 (en) | 2010-04-09 | 2015-03-03 | Shell Oil Company | Helical winding of insulated conductor heaters for installation |
US8701769B2 (en) | 2010-04-09 | 2014-04-22 | Shell Oil Company | Methods for treating hydrocarbon formations based on geology |
US9022109B2 (en) | 2010-04-09 | 2015-05-05 | Shell Oil Company | Leak detection in circulated fluid systems for heating subsurface formations |
US8701768B2 (en) | 2010-04-09 | 2014-04-22 | Shell Oil Company | Methods for treating hydrocarbon formations |
US8616280B2 (en) | 2010-08-30 | 2013-12-31 | Exxonmobil Upstream Research Company | Wellbore mechanical integrity for in situ pyrolysis |
US8622127B2 (en) | 2010-08-30 | 2014-01-07 | Exxonmobil Upstream Research Company | Olefin reduction for in situ pyrolysis oil generation |
US8586867B2 (en) | 2010-10-08 | 2013-11-19 | Shell Oil Company | End termination for three-phase insulated conductors |
US8586866B2 (en) | 2010-10-08 | 2013-11-19 | Shell Oil Company | Hydroformed splice for insulated conductors |
US8943686B2 (en) | 2010-10-08 | 2015-02-03 | Shell Oil Company | Compaction of electrical insulation for joining insulated conductors |
US8857051B2 (en) | 2010-10-08 | 2014-10-14 | Shell Oil Company | System and method for coupling lead-in conductor to insulated conductor |
US9337550B2 (en) | 2010-10-08 | 2016-05-10 | Shell Oil Company | End termination for three-phase insulated conductors |
US9755415B2 (en) | 2010-10-08 | 2017-09-05 | Shell Oil Company | End termination for three-phase insulated conductors |
US8732946B2 (en) | 2010-10-08 | 2014-05-27 | Shell Oil Company | Mechanical compaction of insulator for insulated conductor splices |
US9048653B2 (en) | 2011-04-08 | 2015-06-02 | Shell Oil Company | Systems for joining insulated conductors |
US9016370B2 (en) | 2011-04-08 | 2015-04-28 | Shell Oil Company | Partial solution mining of hydrocarbon containing layers prior to in situ heat treatment |
WO2012177346A1 (en) * | 2011-06-23 | 2012-12-27 | Exxonmobil Upstream Research Company | Electrically conductive methods for in situ pyrolysis of organic-rich rock formations |
US9080409B2 (en) | 2011-10-07 | 2015-07-14 | Shell Oil Company | Integral splice for insulated conductors |
US9309755B2 (en) | 2011-10-07 | 2016-04-12 | Shell Oil Company | Thermal expansion accommodation for circulated fluid systems used to heat subsurface formations |
US9226341B2 (en) | 2011-10-07 | 2015-12-29 | Shell Oil Company | Forming insulated conductors using a final reduction step after heat treating |
US9080917B2 (en) | 2011-10-07 | 2015-07-14 | Shell Oil Company | System and methods for using dielectric properties of an insulated conductor in a subsurface formation to assess properties of the insulated conductor |
US9080441B2 (en) | 2011-11-04 | 2015-07-14 | Exxonmobil Upstream Research Company | Multiple electrical connections to optimize heating for in situ pyrolysis |
US10047594B2 (en) | 2012-01-23 | 2018-08-14 | Genie Ip B.V. | Heater pattern for in situ thermal processing of a subsurface hydrocarbon containing formation |
US8770284B2 (en) | 2012-05-04 | 2014-07-08 | Exxonmobil Upstream Research Company | Systems and methods of detecting an intersection between a wellbore and a subterranean structure that includes a marker material |
US9512699B2 (en) | 2013-10-22 | 2016-12-06 | Exxonmobil Upstream Research Company | Systems and methods for regulating an in situ pyrolysis process |
US9394772B2 (en) | 2013-11-07 | 2016-07-19 | Exxonmobil Upstream Research Company | Systems and methods for in situ resistive heating of organic matter in a subterranean formation |
US9739122B2 (en) | 2014-11-21 | 2017-08-22 | Exxonmobil Upstream Research Company | Mitigating the effects of subsurface shunts during bulk heating of a subsurface formation |
US9644466B2 (en) | 2014-11-21 | 2017-05-09 | Exxonmobil Upstream Research Company | Method of recovering hydrocarbons within a subsurface formation using electric current |
US10941644B2 (en) | 2018-02-20 | 2021-03-09 | Saudi Arabian Oil Company | Downhole well integrity reconstruction in the hydrocarbon industry |
US11624251B2 (en) | 2018-02-20 | 2023-04-11 | Saudi Arabian Oil Company | Downhole well integrity reconstruction in the hydrocarbon industry |
US10641079B2 (en) | 2018-05-08 | 2020-05-05 | Saudi Arabian Oil Company | Solidifying filler material for well-integrity issues |
US11187068B2 (en) | 2019-01-31 | 2021-11-30 | Saudi Arabian Oil Company | Downhole tools for controlled fracture initiation and stimulation |
US11979950B2 (en) | 2020-02-18 | 2024-05-07 | Trs Group, Inc. | Heater for contaminant remediation |
US11414963B2 (en) | 2020-03-25 | 2022-08-16 | Saudi Arabian Oil Company | Wellbore fluid level monitoring system |
US11125075B1 (en) | 2020-03-25 | 2021-09-21 | Saudi Arabian Oil Company | Wellbore fluid level monitoring system |
US11280178B2 (en) | 2020-03-25 | 2022-03-22 | Saudi Arabian Oil Company | Wellbore fluid level monitoring system |
US11414985B2 (en) | 2020-05-28 | 2022-08-16 | Saudi Arabian Oil Company | Measuring wellbore cross-sections using downhole caliper tools |
US11414984B2 (en) | 2020-05-28 | 2022-08-16 | Saudi Arabian Oil Company | Measuring wellbore cross-sections using downhole caliper tools |
US12166168B2 (en) | 2020-06-02 | 2024-12-10 | Saudi Arabian Oil Company | Electrolyte structure for a high-temperature, high-pressure lithium battery |
US11631884B2 (en) | 2020-06-02 | 2023-04-18 | Saudi Arabian Oil Company | Electrolyte structure for a high-temperature, high-pressure lithium battery |
US11391104B2 (en) | 2020-06-03 | 2022-07-19 | Saudi Arabian Oil Company | Freeing a stuck pipe from a wellbore |
US11421497B2 (en) | 2020-06-03 | 2022-08-23 | Saudi Arabian Oil Company | Freeing a stuck pipe from a wellbore |
US11149510B1 (en) | 2020-06-03 | 2021-10-19 | Saudi Arabian Oil Company | Freeing a stuck pipe from a wellbore |
US11719063B2 (en) | 2020-06-03 | 2023-08-08 | Saudi Arabian Oil Company | Freeing a stuck pipe from a wellbore |
US11719089B2 (en) | 2020-07-15 | 2023-08-08 | Saudi Arabian Oil Company | Analysis of drilling slurry solids by image processing |
US11255130B2 (en) | 2020-07-22 | 2022-02-22 | Saudi Arabian Oil Company | Sensing drill bit wear under downhole conditions |
US11506044B2 (en) | 2020-07-23 | 2022-11-22 | Saudi Arabian Oil Company | Automatic analysis of drill string dynamics |
US11867008B2 (en) | 2020-11-05 | 2024-01-09 | Saudi Arabian Oil Company | System and methods for the measurement of drilling mud flow in real-time |
US11434714B2 (en) | 2021-01-04 | 2022-09-06 | Saudi Arabian Oil Company | Adjustable seal for sealing a fluid flow at a wellhead |
US11697991B2 (en) | 2021-01-13 | 2023-07-11 | Saudi Arabian Oil Company | Rig sensor testing and calibration |
US11572752B2 (en) | 2021-02-24 | 2023-02-07 | Saudi Arabian Oil Company | Downhole cable deployment |
US11727555B2 (en) | 2021-02-25 | 2023-08-15 | Saudi Arabian Oil Company | Rig power system efficiency optimization through image processing |
US11642709B1 (en) | 2021-03-04 | 2023-05-09 | Trs Group, Inc. | Optimized flux ERH electrode |
US11846151B2 (en) | 2021-03-09 | 2023-12-19 | Saudi Arabian Oil Company | Repairing a cased wellbore |
US11725504B2 (en) | 2021-05-24 | 2023-08-15 | Saudi Arabian Oil Company | Contactless real-time 3D mapping of surface equipment |
US11619097B2 (en) | 2021-05-24 | 2023-04-04 | Saudi Arabian Oil Company | System and method for laser downhole extended sensing |
US11624265B1 (en) | 2021-11-12 | 2023-04-11 | Saudi Arabian Oil Company | Cutting pipes in wellbores using downhole autonomous jet cutting tools |
US11867012B2 (en) | 2021-12-06 | 2024-01-09 | Saudi Arabian Oil Company | Gauge cutter and sampler apparatus |
US11954800B2 (en) | 2021-12-14 | 2024-04-09 | Saudi Arabian Oil Company | Converting borehole images into three dimensional structures for numerical modeling and simulation applications |
US11739616B1 (en) | 2022-06-02 | 2023-08-29 | Saudi Arabian Oil Company | Forming perforation tunnels in a subterranean formation |
US12203366B2 (en) | 2023-05-02 | 2025-01-21 | Saudi Arabian Oil Company | Collecting samples from wellbores |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3149672A (en) | Method and apparatus for electrical heating of oil-bearing formations | |
US4730671A (en) | Viscous oil recovery using high electrical conductive layers | |
US3547193A (en) | Method and apparatus for recovery of minerals from sub-surface formations using electricity | |
US2757738A (en) | Radiation heating | |
CA2049627C (en) | Recovering hydrocarbons from hydrocarbon bearing deposits | |
US3620300A (en) | Method and apparatus for electrically heating a subsurface formation | |
US3862662A (en) | Method and apparatus for electrical heating of hydrocarbonaceous formations | |
US3105545A (en) | Method of heating underground formations | |
US4401162A (en) | In situ oil shale process | |
US4612988A (en) | Dual aquafer electrical heating of subsurface hydrocarbons | |
US3133592A (en) | Apparatus for the application of electrical energy to subsurface formations | |
US4926941A (en) | Method of producing tar sand deposits containing conductive layers | |
US3211220A (en) | Single well subsurface electrification process | |
US2244255A (en) | Well clearing system | |
US4415034A (en) | Electrode well completion | |
US3642066A (en) | Electrical method and apparatus for the recovery of oil | |
AU601866B2 (en) | Single well stimulation for the recovery of liquid hydrocarbons from subsurface formations | |
US5060726A (en) | Method and apparatus for producing tar sand deposits containing conductive layers having little or no vertical communication | |
US2472445A (en) | Apparatus for treating oil and gas bearing strata | |
US3137347A (en) | In situ electrolinking of oil shale | |
US4412585A (en) | Electrothermal process for recovering hydrocarbons | |
US2244256A (en) | Apparatus for clearing wells | |
US3614986A (en) | Method for injecting heated fluids into mineral bearing formations | |
US4545435A (en) | Conduction heating of hydrocarbonaceous formations | |
US5751895A (en) | Selective excitation of heating electrodes for oil wells |