US2782245A - Electric furnace for melting of high melting point metals or alloys - Google Patents
Electric furnace for melting of high melting point metals or alloys Download PDFInfo
- Publication number
- US2782245A US2782245A US496716A US49671655A US2782245A US 2782245 A US2782245 A US 2782245A US 496716 A US496716 A US 496716A US 49671655 A US49671655 A US 49671655A US 2782245 A US2782245 A US 2782245A
- Authority
- US
- United States
- Prior art keywords
- crucible
- melting
- electrode
- alloys
- base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22B—PRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
- C22B34/00—Obtaining refractory metals
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22B—PRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
- C22B4/00—Electrothermal treatment of ores or metallurgical products for obtaining metals or alloys
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22B—PRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
- C22B4/00—Electrothermal treatment of ores or metallurgical products for obtaining metals or alloys
- C22B4/08—Apparatus
Definitions
- This invention relates to an improved apparatus for use in the arc-melting of high melting point reactive metals and alloys, such for example as titanium, zirconium, molybdenum, thorium, hafnium, tantalum, chromium and their alloys, and more particularly to'apparatus for carrying out a process according to our copending application No. 475,277.
- high melting point reactive metals and alloys such for example as titanium, zirconium, molybdenum, thorium, hafnium, tantalum, chromium and their alloys
- an ap paratus for carrying out the said process which comprises one or more cooled arc-melting crucibles superimposed above a cooled arc-melting crucible of larger cross sectional area and in communication therewith, a longitudinally adjustable cooled base member adapted to serve as a base closure for either the upper or the lower crucibles, means for supplying raw material to the crucible assembly, means for evacuating the said assembly and if desired supplying an inert atmosphere thereto, and a longitudinally adjustable consumable electrode assembly for the upper crucible or crucibles which is adapted to function as electrode stem in the operation of the lower crucible.
- Figure 1 represents a longitudinal section through a combination furnace at the first stage of the process, i. e. the formation of the coherent consumable electrode; the metal to be melted being for the sake of example titanium.
- Figure 2 is a similar section but at the second stage of the process, i. e. the commencement of the final melting stage.
- the apparatus consists essentially of a water-cooled crucible 1 in conjunction with a second water-cooled crucible 2 of larger cross section, both crucibles being served by a common water-cooled base plate 3.
- the top of the furnace is formed by the water-cooled cone 4 carrying in its lid 5 the hopper connection 6, through which raw material in suitable form is fed from the hopper 7 to the furnace at a predetermined rate by means of a vibrator mechanism 8, a vacuum and inert gas connection 9, through which the furnace is evacuated by means of a vacuum pump 10, and then, if desired, filled with an inert atmosphere such as, for example, argon, and a gas seal 11 through which passes the titanited States Patent 0 nium electrode 12.
- the latter may consist of solid titanium, for example, forged bar, or may consist of a number of units consolidated from the divided metal and welded or otherwise joined together into a suitable length.
- Controlled vertical movement of the electrode 12 is effected by means of the feed rolls l3, and the electrode is connected to one terminal of the electrical supply by means of suitable contact gear 14.
- the cone 4 and the crucibles 1 and 2 are electrically insulated from one another by insulating rings 15 and 16.
- the crucible 2 is provided with a separable flanged base member 17 having a central aperture with an inclined face conforming to the base 3 and adapted to act as a seating therefor, and the crucible is closed by means of the box 18.
- the base 3 is of hollow construction and is supported by the hollow stem 19 passing down through the box 18 and gas-tight seal 29.
- the base has an internal bafile and coolant is supplied to and from it via the stem 19. Longitudinal movement of the base 3 is effected by any suitable mechanical means such as a rack and pinion 21.
- the stem is connected to the other terminal of the electrical supply by a contact 22.
- the stem also carries a circular flexible brush .3 for the purpose hereinafter explained.
- the hopper, cone and crucibles are first evacuated and then refilled with an inert gas such as argon or helium.
- the base 3 is then moved to the position shown in Figure 1, an initial charge of the divided metal fed into crucible 1 from the hopper and an arc struck between the charge and the electrode After the initial charge is melted, the divided metal in the hopper is fed into the crucible at as fast a rate as possible, consistent with the production of a coherent mass in the crucible.
- the maximum feed rate is advantageous in that it limits the amount of electrode which is consumed in the operation.
- the base 3 is then lowered to the position shown in Figure 2 by means of the retracting mechanism 21.
- a small amount of unmelted divided metal in the base of crucible 1 may fall on to the inner conical surface of the copper seating member 17 and prevent an accurate seating of the base 3 thereon.
- the brush 23 is secured to the stem 19 so that on loweriug the base, the brush passes through the seating aperture into the box 18 and clears any particles from the seating surface.
- the coherent mass 2d now attached to electrode 12 is moved down to the position shown in Figure 2, this movement being facilitated if required by tapering the crucible 1.
- An initial charge of divided metal is fed into the base of crucible 2 from the hopper and an arc struck between this charge and the mass 24, which is melted into the crucible 2; with or without an additional feed of divided metal from the hopper.
- the electrical supply is cut off, the ingot allowed to solidify and removed by lowering the box 13, seating member 17 and base 3.
- crucible 2 should be somewhat larger than crucible 1 in order that the mass may be fully clear of crucible 1 before it approaches the base of the second crucible, thus a fed of divided metal may fall through the first crucible into the second.
- the latter must also be greater in diameter to ensure that the feed 3 of divided metal may fall freely between the mass 24 and the walls of crucible 2.
- the initial electrode may be totally enclosed together with its feed rolls and contact gear in a gastight tubular extension from the furnace lid, or alternatively the electrode may be attached by suitable means to a water-cooled copper stem passing through the seal in the furnace lid.
- the insulating ring between the upper and lower crucibles may be omitted, but it is preferably included to insure against electrical arcing and short-circuiting between the mass 24 and the upper crucible during the melting of the mass in the lower crucible.
- a plurality of separate upper crucibles for example three, may be used in conjunction with a single lower crucible of'suificiently large diam eter. In this way, three electrode masses may be built up and then consumed simultaneously in the formation of a large ingot in the lower crucible.
- the apparatus in accordance with the present invention facilitates the formation of a large electrode from divided metal in accordance with the process of our aforementioned co-pending application with the minimum consumption of preconsolidated electrode. -Moreover, by the employment of a cooled base which serves for both crucibles it enables the melting of this large electrode to be carried out in the same apparatus and with the minimum time interval between formation and melting.
- Arc-melting furnace which comprises a cooled arcmelting crucible superimposed above a cooled arc-melting crucible of larger cross sectional area, a cooled base member longitudinally adjustable between an upper position where it serves as a base closure for the upper crucible and a lower position where it serves as a base closure for the lower crucible, means for supplying raw material to the crucible assembly, means for evacuating the said assembly and a longitudinally adjustable consumable electrode assembly for the upper crucible adapted also to function as a stern for an electrode formed in the upper crucible for use in the operation of the lower crucible.
- the longitudinally adjustable consumable electrode for the upper crucible comprises a number of units consolidated from divided metal and joined'together into a suitable length.
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Organic Chemistry (AREA)
- Materials Engineering (AREA)
- Mechanical Engineering (AREA)
- Metallurgy (AREA)
- Manufacturing & Machinery (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Manufacture And Refinement Of Metals (AREA)
- Crucibles And Fluidized-Bed Furnaces (AREA)
Description
' Feb. 19, 1957 J. PRESTON 2,782, 45
* v ELECTRIC FURNACE FOR MELTING OF HIGH MELTING POINT METALS OR ALLOYS Filed March 25, 1955 2 Sheets-Sheet 1 i/ g: l6
INVENTOR FIG. JACK PRESTON 7 v f B W Feb. 19, 1957 J. PRESTON ELECTRIC FURNACE FOR MELTING OF HIGH MELTING POINT METALS OR ALLOYS 2 Sheets-Sheet 2 Filed March 25, 1955 N R0 OT TS NE E R VP W K C A J l1 6%, TORNEYS ELECTRIC FURNACE FOR MELTIN G OF HIGH MELTING POINT METALS R ALLOYS Jack Preston, Hall Green, Birmingham, England, assignor to Imperial Chemical Industries Limited, London, England, a corporation of Great Britain Application March 25, 1955, Serial No. 496,716
Claims priority, application Great Britain April 2, 1954 Claims. (Cl. 13--9) This invention relates to an improved apparatus for use in the arc-melting of high melting point reactive metals and alloys, such for example as titanium, zirconium, molybdenum, thorium, hafnium, tantalum, chromium and their alloys, and more particularly to'apparatus for carrying out a process according to our copending application No. 475,277.
In the specification accompanying the said application we have described a method of arc-melting metals and alloys of the kind described by forming a coherent but incompletely melted mass of metal or alloy by feeding the raw material to the melting chamber of an arc-melting furnace at a higher rate than that consistent with complete melting of the raw material over the whole cross section of the melting chamber, and then employing the so-obtained mass as a consumable electrode to be progressively melted in a second arc-melting furnace having a melting chamber of greater cross section than that of the said electrode, with or without an additional feed of raw material into the melting chamber.
According to the present invention, we provide an ap paratus for carrying out the said process which comprises one or more cooled arc-melting crucibles superimposed above a cooled arc-melting crucible of larger cross sectional area and in communication therewith, a longitudinally adjustable cooled base member adapted to serve as a base closure for either the upper or the lower crucibles, means for supplying raw material to the crucible assembly, means for evacuating the said assembly and if desired supplying an inert atmosphere thereto, and a longitudinally adjustable consumable electrode assembly for the upper crucible or crucibles which is adapted to function as electrode stem in the operation of the lower crucible.
The invention is illustrated but not limited by the accompanying drawings in which:
Figure 1 represents a longitudinal section through a combination furnace at the first stage of the process, i. e. the formation of the coherent consumable electrode; the metal to be melted being for the sake of example titanium.
Figure 2 is a similar section but at the second stage of the process, i. e. the commencement of the final melting stage.
Referring to the drawings, the apparatus consists essentially of a water-cooled crucible 1 in conjunction with a second water-cooled crucible 2 of larger cross section, both crucibles being served by a common water-cooled base plate 3.
The top of the furnace is formed by the water-cooled cone 4 carrying in its lid 5 the hopper connection 6, through which raw material in suitable form is fed from the hopper 7 to the furnace at a predetermined rate by means of a vibrator mechanism 8, a vacuum and inert gas connection 9, through which the furnace is evacuated by means of a vacuum pump 10, and then, if desired, filled with an inert atmosphere such as, for example, argon, and a gas seal 11 through which passes the titanited States Patent 0 nium electrode 12. The latter may consist of solid titanium, for example, forged bar, or may consist of a number of units consolidated from the divided metal and welded or otherwise joined together into a suitable length. Controlled vertical movement of the electrode 12 is effected by means of the feed rolls l3, and the electrode is connected to one terminal of the electrical supply by means of suitable contact gear 14. The cone 4 and the crucibles 1 and 2 are electrically insulated from one another by insulating rings 15 and 16.
The crucible 2 is provided with a separable flanged base member 17 having a central aperture with an inclined face conforming to the base 3 and adapted to act as a seating therefor, and the crucible is closed by means of the box 18. The base 3 is of hollow construction and is supported by the hollow stem 19 passing down through the box 18 and gas-tight seal 29. The base has an internal bafile and coolant is supplied to and from it via the stem 19. Longitudinal movement of the base 3 is effected by any suitable mechanical means such as a rack and pinion 21. The stem is connected to the other terminal of the electrical supply by a contact 22. The stem also carries a circular flexible brush .3 for the purpose hereinafter explained.
in operation, the hopper, cone and crucibles are first evacuated and then refilled with an inert gas such as argon or helium. The base 3 is then moved to the position shown in Figure 1, an initial charge of the divided metal fed into crucible 1 from the hopper and an arc struck between the charge and the electrode After the initial charge is melted, the divided metal in the hopper is fed into the crucible at as fast a rate as possible, consistent with the production of a coherent mass in the crucible. The maximum feed rate is advantageous in that it limits the amount of electrode which is consumed in the operation. When the mass 24 has been built up to a suitable height in the crucible, feeding from the hopper is stopped and a molten pool allowed to form at the top of the mass by maintaining the are for a further short period, for example, one to three minutes. The electrical supply is then shut off and the electrode 12 immediately moved down into the pool by means of the feed rolls 13. The mass 24 in the crucible is thus joined to and becomes integral with the electrode by the intimate fusing together of the two.
The base 3 is then lowered to the position shown in Figure 2 by means of the retracting mechanism 21. At this stage, a small amount of unmelted divided metal in the base of crucible 1 may fall on to the inner conical surface of the copper seating member 17 and prevent an accurate seating of the base 3 thereon. To obviate this, the brush 23 is secured to the stem 19 so that on loweriug the base, the brush passes through the seating aperture into the box 18 and clears any particles from the seating surface.
When the base 3 is in position, the coherent mass 2d now attached to electrode 12 is moved down to the position shown in Figure 2, this movement being facilitated if required by tapering the crucible 1. An initial charge of divided metal is fed into the base of crucible 2 from the hopper and an arc struck between this charge and the mass 24, which is melted into the crucible 2; with or without an additional feed of divided metal from the hopper. When the mass 24 is completely melted, the electrical supply is cut off, the ingot allowed to solidify and removed by lowering the box 13, seating member 17 and base 3. It is essential that crucible 2 should be somewhat larger than crucible 1 in order that the mass may be fully clear of crucible 1 before it approaches the base of the second crucible, thus a fed of divided metal may fall through the first crucible into the second. The latter must also be greater in diameter to ensure that the feed 3 of divided metal may fall freely between the mass 24 and the walls of crucible 2.
Whilst the invention has been described with reference to one particular apparatus, it will be appreciated that various modifications may be made in the apparatus and are included within the scope ofthe invention. Thus for example the initial electrode may be totally enclosed together with its feed rolls and contact gear in a gastight tubular extension from the furnace lid, or alternatively the electrode may be attached by suitable means to a water-cooled copper stem passing through the seal in the furnace lid. The insulating ring between the upper and lower crucibles may be omitted, but it is preferably included to insure against electrical arcing and short-circuiting between the mass 24 and the upper crucible during the melting of the mass in the lower crucible.
In a further modification, a plurality of separate upper crucibles, for example three, may be used in conjunction with a single lower crucible of'suificiently large diam eter. In this way, three electrode masses may be built up and then consumed simultaneously in the formation of a large ingot in the lower crucible.
The apparatus in accordance with the present invention facilitates the formation of a large electrode from divided metal in accordance with the process of our aforementioned co-pending application with the minimum consumption of preconsolidated electrode. -Moreover, by the employment of a cooled base which serves for both crucibles it enables the melting of this large electrode to be carried out in the same apparatus and with the minimum time interval between formation and melting.
I claim:
1. Arc-melting furnace which comprises a cooled arcmelting crucible superimposed above a cooled arc-melting crucible of larger cross sectional area, a cooled base member longitudinally adjustable between an upper position where it serves as a base closure for the upper crucible and a lower position where it serves as a base closure for the lower crucible, means for supplying raw material to the crucible assembly, means for evacuating the said assembly and a longitudinally adjustable consumable electrode assembly for the upper crucible adapted also to function as a stern for an electrode formed in the upper crucible for use in the operation of the lower crucible.
2. An arc-melting furnace according to claim 1. wherein said means for evacuating the said assembly is also adapted to supply an inert atmosphere thereto.
3. Furnace in accordance with claim 1, in which the longitudinally adjustable consumable electrode for the upper crucible comprises solid metal.
4. Furnace in accordance with claim 1, in which the longitudinally adjustable consumable electrode for the upper crucible comprises a number of units consolidated from divided metal and joined'together into a suitable length.
5, Furnace in accordance with claim 1, in which the electrode for use in the operation of the lower crucible is formed by allowing a molten pool to form at the top of the coherent mass in the upper crucible, moving the end portion of the longitudinally adjustable consumable electrode down into the pool, and allowing the molten metal to cool.
References Cited in the file of this patent UNITED STATES PATENTS 2,541,764 Herres Feb. '13, 1951 2,640,860 Herres June 2, 1953 2,651,668 Southern Sept. 8, 1953 2,686,822 Evans et al Aug. 17, 1954
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB2782245X | 1954-04-02 |
Publications (1)
Publication Number | Publication Date |
---|---|
US2782245A true US2782245A (en) | 1957-02-19 |
Family
ID=10915233
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US496716A Expired - Lifetime US2782245A (en) | 1954-04-02 | 1955-03-25 | Electric furnace for melting of high melting point metals or alloys |
Country Status (1)
Country | Link |
---|---|
US (1) | US2782245A (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3106594A (en) * | 1961-08-11 | 1963-10-08 | Ling Temco Vought Inc | Heating method |
US3108151A (en) * | 1959-01-16 | 1963-10-22 | Republic Steel Corp | Electric furnace |
US3156753A (en) * | 1961-09-19 | 1964-11-10 | Heraeus Gmbh W C | Melting furnace for metals |
US3205068A (en) * | 1961-03-18 | 1965-09-07 | Commissariat Energie Atomique | Process for the purification of uranium and particularly irradiated uranium |
US3273212A (en) * | 1959-01-16 | 1966-09-20 | Republic Steel Corp | Method of operating an electric furnace |
US3905803A (en) * | 1972-12-06 | 1975-09-16 | Centro Speriment Metallurg | Process for producing ingots by electric resistance melting particulate metal under slag |
US5103458A (en) * | 1991-03-11 | 1992-04-07 | Special Metals Corporation | Electric arc remelting |
US5373529A (en) * | 1992-02-27 | 1994-12-13 | Sandia Corporation | Metals purification by improved vacuum arc remelting |
US20180029110A1 (en) * | 2016-07-28 | 2018-02-01 | Arconic Inc. | Two stage melting and casting system and method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2541764A (en) * | 1948-04-15 | 1951-02-13 | Battelle Development Corp | Electric apparatus for melting refractory metals |
US2640860A (en) * | 1949-10-21 | 1953-06-02 | Allegheny Ludlum Steel | Apparatus for melting titanium to form ingots |
US2651668A (en) * | 1952-06-20 | 1953-09-08 | Allegheny Ludlum Steel | Crucible interchanging mechanism for arc melting furnaces |
US2686822A (en) * | 1950-09-12 | 1954-08-17 | Rem Cru Titanium Inc | Consumable electrode furnace and method for producing titanium |
-
1955
- 1955-03-25 US US496716A patent/US2782245A/en not_active Expired - Lifetime
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2541764A (en) * | 1948-04-15 | 1951-02-13 | Battelle Development Corp | Electric apparatus for melting refractory metals |
US2640860A (en) * | 1949-10-21 | 1953-06-02 | Allegheny Ludlum Steel | Apparatus for melting titanium to form ingots |
US2686822A (en) * | 1950-09-12 | 1954-08-17 | Rem Cru Titanium Inc | Consumable electrode furnace and method for producing titanium |
US2651668A (en) * | 1952-06-20 | 1953-09-08 | Allegheny Ludlum Steel | Crucible interchanging mechanism for arc melting furnaces |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3108151A (en) * | 1959-01-16 | 1963-10-22 | Republic Steel Corp | Electric furnace |
US3273212A (en) * | 1959-01-16 | 1966-09-20 | Republic Steel Corp | Method of operating an electric furnace |
US3205068A (en) * | 1961-03-18 | 1965-09-07 | Commissariat Energie Atomique | Process for the purification of uranium and particularly irradiated uranium |
US3106594A (en) * | 1961-08-11 | 1963-10-08 | Ling Temco Vought Inc | Heating method |
US3156753A (en) * | 1961-09-19 | 1964-11-10 | Heraeus Gmbh W C | Melting furnace for metals |
US3905803A (en) * | 1972-12-06 | 1975-09-16 | Centro Speriment Metallurg | Process for producing ingots by electric resistance melting particulate metal under slag |
US5103458A (en) * | 1991-03-11 | 1992-04-07 | Special Metals Corporation | Electric arc remelting |
US5373529A (en) * | 1992-02-27 | 1994-12-13 | Sandia Corporation | Metals purification by improved vacuum arc remelting |
US20180029110A1 (en) * | 2016-07-28 | 2018-02-01 | Arconic Inc. | Two stage melting and casting system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11389873B2 (en) | Method for producing metal powders by means of gas atomization and production plant of metal powders according to such method | |
US2686822A (en) | Consumable electrode furnace and method for producing titanium | |
CN106544544B (en) | A kind of method of electron-beam cold bed furnace single melting TC4 titan alloy casting ingots | |
US2871533A (en) | Method and apparatus for melting and casting of high melting point metals or alloys | |
US2782245A (en) | Electric furnace for melting of high melting point metals or alloys | |
US2866700A (en) | Drip-melting of refractory metals | |
JP3054193B2 (en) | Induction skull spinning of reactive alloys | |
ES426737A1 (en) | Method for manufacturing ingots of high-melting ferroalloys and metal alloys with good forming properties | |
US3469968A (en) | Electroslag melting | |
US3771585A (en) | Device for melting sponge metal using inert gas plasmas | |
US2958719A (en) | Production of metal | |
US3680163A (en) | Non-consumable electrode vacuum arc furnaces for steel, zirconium, titanium and other metals and processes for working said metals | |
US4681627A (en) | Process for preparing an ingot from metal scrap | |
US3273212A (en) | Method of operating an electric furnace | |
US2798107A (en) | Consumable electrode arc furnace construction and operation | |
GB671171A (en) | An improved process for forming ingots of refractory metal | |
US3905803A (en) | Process for producing ingots by electric resistance melting particulate metal under slag | |
US3848657A (en) | Apparatus for electroslag melting of hollow ingots | |
JPH04123844A (en) | Method and apparatus for continuously melting and casting metal | |
US3287769A (en) | Vacuum melting and casting apparatus | |
US2881489A (en) | Electric arc furnace and the process of preparing castings | |
US3617596A (en) | Nonconsumable electrode vacuum arc furnace for steel, zirconium, titanium and other metals | |
US3708279A (en) | Process of refining metal in a vacuum with coaxially mounted non-consumable electrodes | |
SU553842A1 (en) | Vacuum plasm-electroslag furnace | |
US2946105A (en) | Casting metals |